A platform for research: civil engineering, architecture and urbanism
Post-cast strip formwork system, floor formwork system and construction method
The invention belongs to the field of constructional engineering, and particularly relates to a post-cast strip formwork erecting system, a floor formwork erecting system and a construction method. And a constructor can conveniently chiseling and cleaning the vertical side wall, located in the post-cast strip pouring space, of the formed main floor slab through the first operation interval and the second operation interval, and the beneficial effect of being convenient to operate is achieved. And the situation that the structural stability of the post-cast strip formwork system is affected after the floor formwork system is dismantled is avoided. The method has the advantages of convenience in operation and convenience in field implementation.
本发明属于建筑工程领域,具体涉及一种后浇带支模体系、楼板支模体系以及施工方法,通过设置第一操作间距和第二操作间距,便于施工人员通过第一操作间距和第二操作间距对已成型主楼板位于后浇带浇筑空间处的竖向侧壁进行凿毛和清理作业,具有操作方便的优点。还有利于避免在拆除楼板支模体系之后,后浇带支模体系的结构稳定性受到影响。具有操作方便、利于现场实施的优势。
Post-cast strip formwork system, floor formwork system and construction method
The invention belongs to the field of constructional engineering, and particularly relates to a post-cast strip formwork erecting system, a floor formwork erecting system and a construction method. And a constructor can conveniently chiseling and cleaning the vertical side wall, located in the post-cast strip pouring space, of the formed main floor slab through the first operation interval and the second operation interval, and the beneficial effect of being convenient to operate is achieved. And the situation that the structural stability of the post-cast strip formwork system is affected after the floor formwork system is dismantled is avoided. The method has the advantages of convenience in operation and convenience in field implementation.
本发明属于建筑工程领域,具体涉及一种后浇带支模体系、楼板支模体系以及施工方法,通过设置第一操作间距和第二操作间距,便于施工人员通过第一操作间距和第二操作间距对已成型主楼板位于后浇带浇筑空间处的竖向侧壁进行凿毛和清理作业,具有操作方便的优点。还有利于避免在拆除楼板支模体系之后,后浇带支模体系的结构稳定性受到影响。具有操作方便、利于现场实施的优势。
Post-cast strip formwork system, floor formwork system and construction method
后浇带支模体系、楼板支模体系以及施工方法
ZHANG JUN (author) / YANG QINGDONG (author) / LYU QINGHAO (author) / SI KUNPENG (author)
2024-05-10
Patent
Electronic Resource
Chinese
Floor post-cast strip formwork erecting formwork structure
European Patent Office | 2023
|Construction method for floor system concrete post-cast strip suspended formwork
European Patent Office | 2015
|Floor post-cast strip formwork erecting device and construction method
European Patent Office | 2023
|Floor post-cast strip non-dismantling formwork system and construction method thereof
European Patent Office | 2022
|