A platform for research: civil engineering, architecture and urbanism
Segmented assembly construction method and device for electric power iron tower by adopting automatic docking device
The invention discloses an electric power iron tower segmented assembly construction method and device adopting an automatic butt joint device, and relates to the technical field of electric power iron towers, the electric power iron tower segmented assembly construction device comprises a first iron tower body and a second iron tower body, and the automatic butt joint device is arranged between the first iron tower body and the second iron tower body; four butt joint auxiliary blocks are fixedly connected to the inner side of the first iron tower body, and butt joint protection parts and automatic clamping assemblies are arranged on the outer walls of the two sides of the butt joint auxiliary blocks. By arranging the automatic butt joint device, the moving direction of the second iron tower body is guided through the conical surface, so that the connecting column can move towards the direction of the through hole under the action of the conical surface until the connecting column is inserted into the through hole, and the second iron tower body can be quickly and accurately in butt joint with the first iron tower body; in this way, continuous fine adjustment is not needed in the butt joint process of the second iron tower body and the first iron tower body, and then the butt joint efficiency of the second iron tower body and the first iron tower body is improved.
本发明公开了一种采用自动对接装置电力铁塔分段组装施工方法及装置,涉及电力铁塔技术领域,包括第一铁塔本体,第二铁塔本体,所述第一铁塔本体与所述第二铁塔本体之间设置有自动对接器,所述第一铁塔本体的内侧固定连接有四个对接辅助块,所述对接辅助块的两侧外壁设置有对接防护件,自动卡接组件。本发明通过设置自动对接器,通过锥面对第二铁塔本体移动的方向进行导向,使得连接柱能够在锥面的作用下向通孔方向进行移动,直至连接柱插入到通孔内部,从而使得第二铁塔本体能够快速准确的与第一铁塔本体对接,以此使得第二铁塔本体在与第一铁塔本体对接的过程中无需进行不断微调,进而提高了第二铁塔本体与第一铁塔本体的对接效率。
Segmented assembly construction method and device for electric power iron tower by adopting automatic docking device
The invention discloses an electric power iron tower segmented assembly construction method and device adopting an automatic butt joint device, and relates to the technical field of electric power iron towers, the electric power iron tower segmented assembly construction device comprises a first iron tower body and a second iron tower body, and the automatic butt joint device is arranged between the first iron tower body and the second iron tower body; four butt joint auxiliary blocks are fixedly connected to the inner side of the first iron tower body, and butt joint protection parts and automatic clamping assemblies are arranged on the outer walls of the two sides of the butt joint auxiliary blocks. By arranging the automatic butt joint device, the moving direction of the second iron tower body is guided through the conical surface, so that the connecting column can move towards the direction of the through hole under the action of the conical surface until the connecting column is inserted into the through hole, and the second iron tower body can be quickly and accurately in butt joint with the first iron tower body; in this way, continuous fine adjustment is not needed in the butt joint process of the second iron tower body and the first iron tower body, and then the butt joint efficiency of the second iron tower body and the first iron tower body is improved.
本发明公开了一种采用自动对接装置电力铁塔分段组装施工方法及装置,涉及电力铁塔技术领域,包括第一铁塔本体,第二铁塔本体,所述第一铁塔本体与所述第二铁塔本体之间设置有自动对接器,所述第一铁塔本体的内侧固定连接有四个对接辅助块,所述对接辅助块的两侧外壁设置有对接防护件,自动卡接组件。本发明通过设置自动对接器,通过锥面对第二铁塔本体移动的方向进行导向,使得连接柱能够在锥面的作用下向通孔方向进行移动,直至连接柱插入到通孔内部,从而使得第二铁塔本体能够快速准确的与第一铁塔本体对接,以此使得第二铁塔本体在与第一铁塔本体对接的过程中无需进行不断微调,进而提高了第二铁塔本体与第一铁塔本体的对接效率。
Segmented assembly construction method and device for electric power iron tower by adopting automatic docking device
一种采用自动对接装置电力铁塔分段组装施工方法及装置
HU PAN (author) / CHEN YUANSHUANG (author) / SU JIANNAN (author) / CHEN ZHIJIAN (author) / ZHENG YUHUA (author) / YAN LIANG (author) / ZHU YUFENG (author) / LIN WEI (author) / CHEN ZUNRONG (author)
2024-05-10
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Protection method and device for electric power iron tower construction
European Patent Office | 2024
|Safety construction device for power transmission line iron tower assembly
European Patent Office | 2023
|Gravel laying method and device for electric power iron tower foundation construction
European Patent Office | 2024
|