A platform for research: civil engineering, architecture and urbanism
Temporary passage for pedestrians to pass through in groove construction
The invention discloses a temporary passage for pedestrians to pass through in groove construction, and relates to the technical field of pipeline construction, the temporary passage comprises a ground, a groove is formed in the top end of the ground, side slopes are fixedly arranged on the two sides of the groove, and a supporting seat is fixedly arranged at the bottom end of the interior of the groove; supporting mechanisms are fixedly arranged at the top end of the supporting base in a front-back symmetry mode, supporting mechanisms are symmetrically arranged on the left side and the right side of each supporting mechanism, square steel pipe main beams are fixedly arranged at the top ends of the two supporting mechanisms correspondingly, and a plurality of square steel pipe secondary beams are fixedly arranged between the two square steel pipe main beams; a bottom plate is fixedly arranged at the top ends of the square steel pipe secondary beams, a safety channel is formed in the top end of the bottom plate, and protection mechanisms are symmetrically arranged on the front side and the rear side of the safety channel. According to the temporary passage for pedestrians to pass in the groove construction, the problems of pedestrian passing and safety in the construction process can be effectively solved by arranging the supporting mechanism and the protection mechanism.
本发明公开了一种沟槽施工中行人通过临时通道,本发明涉及管道施工技术领域,包括地面,所述地面的顶端开设有沟槽,所述沟槽的两侧固定设置有边坡,所述沟槽的内部底端固定设置有支撑座,所述支撑座的顶端前后对称固定设置有支撑机构,所述支撑机构的左右两侧对称设置有支护机构,两个所述支撑机构的顶端均固定设置有方钢管主梁,两个所述方钢管主梁之间固定设置有若干个方钢管次梁,若干个所述方钢管次梁的顶端固定设置有底板,所述底板的顶端形成有安全通道,所述安全通道的前后两侧对称设置有防护机构;该沟槽施工中行人通过临时通道,通过设置支撑机构和防护机构,可以有效解决施工过程中行人通行和安全问题。
Temporary passage for pedestrians to pass through in groove construction
The invention discloses a temporary passage for pedestrians to pass through in groove construction, and relates to the technical field of pipeline construction, the temporary passage comprises a ground, a groove is formed in the top end of the ground, side slopes are fixedly arranged on the two sides of the groove, and a supporting seat is fixedly arranged at the bottom end of the interior of the groove; supporting mechanisms are fixedly arranged at the top end of the supporting base in a front-back symmetry mode, supporting mechanisms are symmetrically arranged on the left side and the right side of each supporting mechanism, square steel pipe main beams are fixedly arranged at the top ends of the two supporting mechanisms correspondingly, and a plurality of square steel pipe secondary beams are fixedly arranged between the two square steel pipe main beams; a bottom plate is fixedly arranged at the top ends of the square steel pipe secondary beams, a safety channel is formed in the top end of the bottom plate, and protection mechanisms are symmetrically arranged on the front side and the rear side of the safety channel. According to the temporary passage for pedestrians to pass in the groove construction, the problems of pedestrian passing and safety in the construction process can be effectively solved by arranging the supporting mechanism and the protection mechanism.
本发明公开了一种沟槽施工中行人通过临时通道,本发明涉及管道施工技术领域,包括地面,所述地面的顶端开设有沟槽,所述沟槽的两侧固定设置有边坡,所述沟槽的内部底端固定设置有支撑座,所述支撑座的顶端前后对称固定设置有支撑机构,所述支撑机构的左右两侧对称设置有支护机构,两个所述支撑机构的顶端均固定设置有方钢管主梁,两个所述方钢管主梁之间固定设置有若干个方钢管次梁,若干个所述方钢管次梁的顶端固定设置有底板,所述底板的顶端形成有安全通道,所述安全通道的前后两侧对称设置有防护机构;该沟槽施工中行人通过临时通道,通过设置支撑机构和防护机构,可以有效解决施工过程中行人通行和安全问题。
Temporary passage for pedestrians to pass through in groove construction
一种沟槽施工中行人通过临时通道
2024-05-17
Patent
Electronic Resource
Chinese
European Patent Office | 2015
|