Linear control construction method and system for ultrahigh concrete bridge tower
The invention relates to the field of ultrahigh concrete, in particular to a linear control construction method and system for an ultrahigh concrete bridge tower, and belongs to the field of linear control. The linear control construction method comprises the following steps that S1, early-stage preparation is conducted, a construction plan is made, and the construction time, progress and resource plan are determined; s2, measurement and calibration are carried out, and reference measurement is carried out; s3, mounting a template and a bracket, and mounting a linear control template; s4, concrete pouring is conducted, in-place pouring is conducted, the concrete is conveyed to the position of a formwork, and in-place pouring is conducted; s5, monitoring and adjusting the line shape; s6, quality inspection: inspecting the quality of the concrete; s7, performing construction recording and reporting, recording a construction process, and recording key steps and data in the construction process in detail; compiling a construction report, and summarizing a construction process, including problem solving and experience training; s8, completing acceptance, performing final acceptance, and performing final acceptance according to design requirements and contract terms; perfecting the construction archives, and arranging and perfecting the construction archives.
本发明公开了涉及超高混凝土领域,涉及所述超高混凝土桥塔线形控制施工方法及系统,属于线形控制领域,包括以下步骤:S1.前期准备,制定施工计划,确定施工的时间、进度和资源计划;S2.测量与标定,进行基准测量;S3.模板和支架安装,安装线形控制模板;S4.混凝土浇筑,就位浇筑,将所述混凝土运送到模板位置,进行所述就位浇筑;S5.线形监测与调整;S6.质量检验,进行所述混凝土质量检验;S7.施工记录与报告,记录施工过程,详细记录施工过程中的关键步骤和数据;编制施工报告,总结施工过程,包括问题解决和经验教训;S8.完工验收,进行最终验收,根据设计要求和合同条款进行最终验收;完善施工档案,整理并完善施工档案。
Linear control construction method and system for ultrahigh concrete bridge tower
The invention relates to the field of ultrahigh concrete, in particular to a linear control construction method and system for an ultrahigh concrete bridge tower, and belongs to the field of linear control. The linear control construction method comprises the following steps that S1, early-stage preparation is conducted, a construction plan is made, and the construction time, progress and resource plan are determined; s2, measurement and calibration are carried out, and reference measurement is carried out; s3, mounting a template and a bracket, and mounting a linear control template; s4, concrete pouring is conducted, in-place pouring is conducted, the concrete is conveyed to the position of a formwork, and in-place pouring is conducted; s5, monitoring and adjusting the line shape; s6, quality inspection: inspecting the quality of the concrete; s7, performing construction recording and reporting, recording a construction process, and recording key steps and data in the construction process in detail; compiling a construction report, and summarizing a construction process, including problem solving and experience training; s8, completing acceptance, performing final acceptance, and performing final acceptance according to design requirements and contract terms; perfecting the construction archives, and arranging and perfecting the construction archives.
本发明公开了涉及超高混凝土领域,涉及所述超高混凝土桥塔线形控制施工方法及系统,属于线形控制领域,包括以下步骤:S1.前期准备,制定施工计划,确定施工的时间、进度和资源计划;S2.测量与标定,进行基准测量;S3.模板和支架安装,安装线形控制模板;S4.混凝土浇筑,就位浇筑,将所述混凝土运送到模板位置,进行所述就位浇筑;S5.线形监测与调整;S6.质量检验,进行所述混凝土质量检验;S7.施工记录与报告,记录施工过程,详细记录施工过程中的关键步骤和数据;编制施工报告,总结施工过程,包括问题解决和经验教训;S8.完工验收,进行最终验收,根据设计要求和合同条款进行最终验收;完善施工档案,整理并完善施工档案。
Linear control construction method and system for ultrahigh concrete bridge tower
超高混凝土桥塔线形控制施工方法及系统
ZHAO JIAN (author) / YU CHAO (author) / AN LUMING (author) / DING YAN (author) / ZHU XINGDONG (author) / XIN MING (author) / WANG LEI (author) / CHEN GANG (author) / ZHANG PENGZHI (author) / CHEN MEIYU (author)
2024-05-28
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
/
G01B
MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS
,
Messen der Länge, der Dicke oder ähnlicher linearer Abmessungen
/
G01D
MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE
,
Anzeigen oder Aufzeichnen in Verbindung mit Messen allgemein
/
G01S
RADIO DIRECTION-FINDING
,
Funkpeilung
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
G08B
SIGNALLING OR CALLING SYSTEMS
,
Signalisier- oder Rufsysteme
/
H04N
PICTORIAL COMMUNICATION, e.g. TELEVISION
,
Bildübertragung, z.B. Fernsehen
/
H04Q
Wähltechnik
,
SELECTING
/
H04W
WIRELESS COMMUNICATION NETWORKS
,
Drahtlose Kommunikationsnetze
Ultrahigh bridge tower concrete curing structure and curing method
European Patent Office | 2022
|Ultrahigh double-tower connected bridge tower cross beam construction device and method
European Patent Office | 2024
|Intelligent maintenance structure and method for ultrahigh bridge tower concrete
European Patent Office | 2024
|Linear control method for steel-concrete combined bridge tower in construction stage
European Patent Office | 2024
|European Patent Office | 2024
|