The invention discloses a wall cable slotting structure and a construction method, the wall cable slotting structure comprises a notch A and a notch B, the notch A and the notch B are arranged on a wall, and the notch B is arranged on one side of the notch A. The construction method comprises the following steps that the position, needing to be slotted, of a wall is determined, the slotted position of the wall is marked, the position in a wall groove is chiseled, scum or sediment is manually removed, a notch A and a notch B are obtained, the notch A and the notch B are wetted through water, a threading pipe and a cable are protected and fixed, a threading structure is fixed into the notch B, the cable is arranged in the threading pipe, and the threading pipe is fixed into the notch B; filling the filling layer A into the inner wall of the notch A and the inner wall of the notch B, and filling the filling layer B after the template is supported. The structure comprises the slotting structure, the threading structure and the filling structure, the slotting area can be effectively reduced, the shape of the notch A can enable a section with a large inside and a small outside to be formed between concrete and a wall body in the later period, combination between the wall body and the concrete is enhanced, and firmness and sealing performance are improved.
本发明公开了一种墙体线缆开槽结构及施工方法,墙体线缆开槽结构包括槽口A和槽口B,所述槽口A和槽口B设置在墙体上,所述槽口B设置在槽口A一侧。施工方法包括以下步骤:确定墙体须开槽位置,对墙体开槽位置进行划线标记,凿墙体槽中位置,人工清除浮渣或沉渣,得到槽口A和槽口B,散水润湿槽口A和槽口B,安防及固定穿线管和线缆,将穿线结构固定于槽口B内,线缆置于穿线管中,对槽口A和槽口B内壁填入填充层A,支撑模板后再填入填充层B即可。本发明包括开槽结构、穿线结构和填充结构构成,可有效减少开槽面积,槽口A的形状可使得后期混凝土与墙体之间形成内大外小的断面,加强了墙体与混凝土间的结合,使得牢固性、密封性提高。
Wall cable slotting structure and construction method
The invention discloses a wall cable slotting structure and a construction method, the wall cable slotting structure comprises a notch A and a notch B, the notch A and the notch B are arranged on a wall, and the notch B is arranged on one side of the notch A. The construction method comprises the following steps that the position, needing to be slotted, of a wall is determined, the slotted position of the wall is marked, the position in a wall groove is chiseled, scum or sediment is manually removed, a notch A and a notch B are obtained, the notch A and the notch B are wetted through water, a threading pipe and a cable are protected and fixed, a threading structure is fixed into the notch B, the cable is arranged in the threading pipe, and the threading pipe is fixed into the notch B; filling the filling layer A into the inner wall of the notch A and the inner wall of the notch B, and filling the filling layer B after the template is supported. The structure comprises the slotting structure, the threading structure and the filling structure, the slotting area can be effectively reduced, the shape of the notch A can enable a section with a large inside and a small outside to be formed between concrete and a wall body in the later period, combination between the wall body and the concrete is enhanced, and firmness and sealing performance are improved.
本发明公开了一种墙体线缆开槽结构及施工方法,墙体线缆开槽结构包括槽口A和槽口B,所述槽口A和槽口B设置在墙体上,所述槽口B设置在槽口A一侧。施工方法包括以下步骤:确定墙体须开槽位置,对墙体开槽位置进行划线标记,凿墙体槽中位置,人工清除浮渣或沉渣,得到槽口A和槽口B,散水润湿槽口A和槽口B,安防及固定穿线管和线缆,将穿线结构固定于槽口B内,线缆置于穿线管中,对槽口A和槽口B内壁填入填充层A,支撑模板后再填入填充层B即可。本发明包括开槽结构、穿线结构和填充结构构成,可有效减少开槽面积,槽口A的形状可使得后期混凝土与墙体之间形成内大外小的断面,加强了墙体与混凝土间的结合,使得牢固性、密封性提高。
Wall cable slotting structure and construction method
一种墙体线缆开槽结构及施工方法
TAO YONGHU (author) / CHOI JUN-HO (author) / HUANG BANGYOU (author)
2024-05-28
Patent
Electronic Resource
Chinese
Construction method for automatic slotting of brick wall
European Patent Office | 2021
|Pottery clay plate curtain wall sealant semi-slotting construction method
European Patent Office | 2024
|Light partition wall slotting repairing structure and process method
European Patent Office | 2024
|