A platform for research: civil engineering, architecture and urbanism
Pile foundation perpendicularity control method in pile plate type soilless roadbed construction process
The invention provides a pile foundation perpendicularity control method in the pile plate type soilless roadbed construction process. The pile foundation perpendicularity control method comprises the steps of arranging a measurement and data processing system, starting pile operation, measuring and obtaining data, preliminarily arranging the data, analyzing the data, judging the data and adopting corresponding control measures. The pile foundation perpendicularity control method in the pile plate type soilless roadbed construction process is suitable for the field of constructional engineering and has the advantages of being real-time, accurate, wide in applicability and the like.
本发明提供了一种桩板式无土路基施工过程桩基垂直度控制方法,包括测量及数据处理系统的布置、开始桩作业、测量并获得数据、数据的初步整理数据的分析和数据的判断以及对应控制措施的采用;本发明提供的一种桩板式无土路基施工过程桩基垂直度控制方法,适用于建筑工程领域,具有实时性、精确性和广泛适用性等优点。
Pile foundation perpendicularity control method in pile plate type soilless roadbed construction process
The invention provides a pile foundation perpendicularity control method in the pile plate type soilless roadbed construction process. The pile foundation perpendicularity control method comprises the steps of arranging a measurement and data processing system, starting pile operation, measuring and obtaining data, preliminarily arranging the data, analyzing the data, judging the data and adopting corresponding control measures. The pile foundation perpendicularity control method in the pile plate type soilless roadbed construction process is suitable for the field of constructional engineering and has the advantages of being real-time, accurate, wide in applicability and the like.
本发明提供了一种桩板式无土路基施工过程桩基垂直度控制方法,包括测量及数据处理系统的布置、开始桩作业、测量并获得数据、数据的初步整理数据的分析和数据的判断以及对应控制措施的采用;本发明提供的一种桩板式无土路基施工过程桩基垂直度控制方法,适用于建筑工程领域,具有实时性、精确性和广泛适用性等优点。
Pile foundation perpendicularity control method in pile plate type soilless roadbed construction process
一种桩板式无土路基施工过程桩基垂直度控制方法
XIE HUAQING (author) / CHEN XIAOLI (author) / YANG XIN (author) / CHEN MINGHUI (author) / QIU WANQIN (author) / AI FENGMEI (author) / KANG LIANGRUI (author) / LI SHANZHOU (author) / YUAN DONGLIU (author) / ZHAO YUPING (author)
2024-05-28
Patent
Electronic Resource
Chinese
IPC:
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
E02D
FOUNDATIONS
,
Gründungen
/
G06N
COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
,
Rechnersysteme, basierend auf spezifischen Rechenmodellen
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Pile plate type soilless roadbed highway construction process
European Patent Office | 2020
|European Patent Office | 2023
|European Patent Office | 2021
|Handheld pile foundation perpendicularity detection device
European Patent Office | 2024
|