A platform for research: civil engineering, architecture and urbanism
Offshore wind power barrel type foundation barrel top subdivision grouting ballast leveling device and using method
The invention discloses an offshore wind power barrel type foundation barrel top subdivision grouting ballast leveling device and a using method. The device comprises a barrel top sub-cabin, a sealing plate and a grouting pipeline, the barrel top sub-cabin is arranged on the barrel top of the barrel type foundation, the sealing plate is welded to the upper surface of the barrel top sub-cabin, holes are correspondingly formed in the sealing plate according to the arrangement of the barrel top sub-cabin, and the grouting pipeline is communicated with the interior of the barrel top sub-cabin through the holes. The defects that according to an existing barrel type foundation, pressure maintaining is difficult in bottom cabin inflation or grouting, and the leveling process is not easy to control are overcome.
本发明公开了一种海上风电筒型基础筒顶分舱灌浆压载调平装置及使用方法。它包括筒顶分舱、封板及灌浆管路,所述筒顶分舱设于筒型基础筒顶,所述封板焊接于筒顶分舱上表面,所述封板上依据筒顶分舱的布置相应进行开孔,所述灌浆管路通过开孔与筒顶分舱内部连通。本发明克服了现有的筒型基础在底部分舱充气或灌浆难以保压及调平过程不易控制的缺陷。
Offshore wind power barrel type foundation barrel top subdivision grouting ballast leveling device and using method
The invention discloses an offshore wind power barrel type foundation barrel top subdivision grouting ballast leveling device and a using method. The device comprises a barrel top sub-cabin, a sealing plate and a grouting pipeline, the barrel top sub-cabin is arranged on the barrel top of the barrel type foundation, the sealing plate is welded to the upper surface of the barrel top sub-cabin, holes are correspondingly formed in the sealing plate according to the arrangement of the barrel top sub-cabin, and the grouting pipeline is communicated with the interior of the barrel top sub-cabin through the holes. The defects that according to an existing barrel type foundation, pressure maintaining is difficult in bottom cabin inflation or grouting, and the leveling process is not easy to control are overcome.
本发明公开了一种海上风电筒型基础筒顶分舱灌浆压载调平装置及使用方法。它包括筒顶分舱、封板及灌浆管路,所述筒顶分舱设于筒型基础筒顶,所述封板焊接于筒顶分舱上表面,所述封板上依据筒顶分舱的布置相应进行开孔,所述灌浆管路通过开孔与筒顶分舱内部连通。本发明克服了现有的筒型基础在底部分舱充气或灌浆难以保压及调平过程不易控制的缺陷。
Offshore wind power barrel type foundation barrel top subdivision grouting ballast leveling device and using method
一种海上风电筒型基础筒顶分舱灌浆压载调平装置及使用方法
ZHANG CHENG (author) / LIU HAIBO (author) / TAO TIELING (author) / GAN LE (author) / ZHANG FENG (author) / WU SIZHOU (author) / MA SITENG (author) / DUAN FEI (author)
2024-05-31
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Jacket barrel type offshore wind power foundation with movable ballast
European Patent Office | 2024
|Offshore wind power barrel type foundation and air bag grouting construction method
European Patent Office | 2021
|Assembly type offshore wind power barrel-shaped foundation
European Patent Office | 2020
|