A platform for research: civil engineering, architecture and urbanism
Water conservancy project flood bank
The flood bank comprises a first reinforced concrete layer which is vertically arranged, and a first concrete mortar layer, a first waterproof roll layer, a second reinforced concrete layer, a second waterproof roll layer and a second concrete mortar layer are sequentially arranged on the right side of the first reinforced concrete layer. An anti-impact assembly is arranged on the outer side of the second concrete mortar layer, an inserting groove is formed in the top of the second reinforced concrete layer, a flood prevention plate is inserted into the inserting groove and controlled to ascend and descend through a lifting assembly, and a plurality of sealing assemblies are connected to the front end face of the flood prevention plate. When facing river waves or sea waves with different heights, the flood control plate can be controlled to rise through the lifting assembly, then waves are prevented from overflowing the flood control bank, the applicability of the device is improved, the flood control effect of the device is improved, the waves can be shunted through the anti-impact assembly, and the flood control effect of the device is improved. And the impact on the flood bank is reduced through the conical anti-impact thorns at the moment when the flood bank is impacted, so that the anti-impact effect of the flood bank is improved.
本发明公开了一种水利工程防洪堤,包括竖直设置的第一钢筋混凝土层,第一钢筋混凝土层的右侧依次设有第一混凝土砂浆层、第一防水卷材层、第二钢筋混凝土层、第二防水卷材层和第二混凝土砂浆层,第二混凝土砂浆层的外侧设有抗冲击组件,第二钢筋混凝土层的顶部开设有插槽,插槽内插入有防洪板,防洪板通过升降组件控制升降,防洪板的前端面上连接有若干个密封组件。本发明在面对不同高度的河浪或海浪时,能够通过升降组件控制防洪板升起,进而避免浪头漫过防洪堤,不仅提高了装置的适用性,还提高了装置的防洪效果,并且利用抗冲击组件能够使浪头分流,并在撞击防洪堤的一瞬间通过锥形抗冲击刺减少防洪堤受到的冲击,提高了防洪堤的抗冲击效果。
Water conservancy project flood bank
The flood bank comprises a first reinforced concrete layer which is vertically arranged, and a first concrete mortar layer, a first waterproof roll layer, a second reinforced concrete layer, a second waterproof roll layer and a second concrete mortar layer are sequentially arranged on the right side of the first reinforced concrete layer. An anti-impact assembly is arranged on the outer side of the second concrete mortar layer, an inserting groove is formed in the top of the second reinforced concrete layer, a flood prevention plate is inserted into the inserting groove and controlled to ascend and descend through a lifting assembly, and a plurality of sealing assemblies are connected to the front end face of the flood prevention plate. When facing river waves or sea waves with different heights, the flood control plate can be controlled to rise through the lifting assembly, then waves are prevented from overflowing the flood control bank, the applicability of the device is improved, the flood control effect of the device is improved, the waves can be shunted through the anti-impact assembly, and the flood control effect of the device is improved. And the impact on the flood bank is reduced through the conical anti-impact thorns at the moment when the flood bank is impacted, so that the anti-impact effect of the flood bank is improved.
本发明公开了一种水利工程防洪堤,包括竖直设置的第一钢筋混凝土层,第一钢筋混凝土层的右侧依次设有第一混凝土砂浆层、第一防水卷材层、第二钢筋混凝土层、第二防水卷材层和第二混凝土砂浆层,第二混凝土砂浆层的外侧设有抗冲击组件,第二钢筋混凝土层的顶部开设有插槽,插槽内插入有防洪板,防洪板通过升降组件控制升降,防洪板的前端面上连接有若干个密封组件。本发明在面对不同高度的河浪或海浪时,能够通过升降组件控制防洪板升起,进而避免浪头漫过防洪堤,不仅提高了装置的适用性,还提高了装置的防洪效果,并且利用抗冲击组件能够使浪头分流,并在撞击防洪堤的一瞬间通过锥形抗冲击刺减少防洪堤受到的冲击,提高了防洪堤的抗冲击效果。
Water conservancy project flood bank
一种水利工程防洪堤
YANG LUOPENG (author) / HE QI (author) / ZHANG SHENGHUA (author) / JIN YANLI (author) / SHE XUDONG (author) / XU BINBIN (author) / LI HAIJUN (author) / YAN HAO (author) / YAN XIAONA (author) / CAO YING (author)
2024-06-04
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau