A platform for research: civil engineering, architecture and urbanism
Construction method for silver-wrapped-in-gold concrete structure
The invention relates to the technical field of concrete construction, and provides a gold-clad silver concrete structure construction method which comprises the following steps that a first pouring area is arranged on the periphery of a concrete structure for pouring, and the first pouring area is used for pouring a first type of concrete layer; a second pouring area is arranged in the center of the concrete structure, and the second pouring area is used for pouring a second type of concrete layer; the corrosion resistance of the first concrete layer is higher than that of the second concrete layer; and the first type concrete layer and the second type concrete layer are poured, and the volume of the first type concrete layer is larger than the volume of the first pouring area. The problem that in the prior art, when the anti-corrosion requirement exists, the scheme that the whole building is poured through anti-corrosion concrete is adopted, and then the construction cost is high can be solved.
本发明涉及混凝土施工技术领域,提供了一种金包银混凝土结构施工方法,包含如下步骤:在混凝土结构的外围设置浇筑第一浇筑区域,第一浇筑区域用于浇筑第一类混凝土层;在混凝土结构的中心部设置第二浇筑区域,第二浇筑区域用于浇筑第二类混凝土层;所述第一类混凝土层的抗腐蚀能力大于所述第二类混凝土层;浇筑所述第一类混凝土层和所述第二类混凝土层,所述第一类混凝土层的体积大于第一浇筑区域的容积。本发明能解决现有技术在有耐腐蚀需求时,采用整个建筑均使用耐腐蚀混凝土进行浇筑的方案,进而导致施工成本高昂的问题。
Construction method for silver-wrapped-in-gold concrete structure
The invention relates to the technical field of concrete construction, and provides a gold-clad silver concrete structure construction method which comprises the following steps that a first pouring area is arranged on the periphery of a concrete structure for pouring, and the first pouring area is used for pouring a first type of concrete layer; a second pouring area is arranged in the center of the concrete structure, and the second pouring area is used for pouring a second type of concrete layer; the corrosion resistance of the first concrete layer is higher than that of the second concrete layer; and the first type concrete layer and the second type concrete layer are poured, and the volume of the first type concrete layer is larger than the volume of the first pouring area. The problem that in the prior art, when the anti-corrosion requirement exists, the scheme that the whole building is poured through anti-corrosion concrete is adopted, and then the construction cost is high can be solved.
本发明涉及混凝土施工技术领域,提供了一种金包银混凝土结构施工方法,包含如下步骤:在混凝土结构的外围设置浇筑第一浇筑区域,第一浇筑区域用于浇筑第一类混凝土层;在混凝土结构的中心部设置第二浇筑区域,第二浇筑区域用于浇筑第二类混凝土层;所述第一类混凝土层的抗腐蚀能力大于所述第二类混凝土层;浇筑所述第一类混凝土层和所述第二类混凝土层,所述第一类混凝土层的体积大于第一浇筑区域的容积。本发明能解决现有技术在有耐腐蚀需求时,采用整个建筑均使用耐腐蚀混凝土进行浇筑的方案,进而导致施工成本高昂的问题。
Construction method for silver-wrapped-in-gold concrete structure
一种金包银混凝土结构施工方法
YANG JIANCHONG (author) / PAN JIAN (author) / HE LIPING (author) / WANG XIANZHANG (author) / CHEN XIAO (author) / LIU FEI (author) / CHEN QIUYUE (author) / ZHONG GUANGDA (author) / LIANG QI (author) / ZHANG CONG (author)
2024-06-07
Patent
Electronic Resource
Chinese
Silver-wrapped-in-gold steel structure straw building component
European Patent Office | 2020
|Fully-wrapped concrete truss structure and construction method thereof
European Patent Office | 2024
|European Patent Office | 2022
|Volute outer wrapped concrete and surrounding structure combined stress construction method
European Patent Office | 2020
|Concrete-wrapped steel pipe concrete combination column and construction method
European Patent Office | 2021
|