A platform for research: civil engineering, architecture and urbanism
Communication line laying device
The invention relates to the technical field of line laying, in particular to a communication line laying device which comprises a fourth connecting plate, first connecting rods are rotatably connected to the outer walls of the two sides of the end, away from a supporting frame, of a first connecting plate, and first sliding plates are fixedly connected to the outer walls of the two first connecting rods. The first sliding plate is located below the line winding drum, the first sliding plate is slidably connected with the inner wall of the bottom plate, a stop lever is arranged above the door plate, a plurality of height adjusting grooves which are evenly distributed are formed in the side wall of the adjusting frame, and an overall pay-off mechanism is arranged on the outer wall of the adjusting frame. In the line laying process, soil above and below the line is treated at the same time, some stones existing in a ditch are synchronously collected and treated, then rubber on the surface of the line is prevented from being damaged and affected with damp, and the service life of the line is prolonged.
本发明涉及线路铺设技术领域,具体涉及一种通讯线路铺设装置,包括第四连接板,所述第一连接板远离支撑架的一端两侧外壁均转动连接有第一连接杆,两个所述第一连接杆的外壁均固定连接有第一滑板,所述第一滑板位于线路卷筒的下方,所述第一滑板与底板的内壁滑动连接,所述门板的上方设置有挡杆,所述调节架的侧壁开设有若干均匀分布的高度调节槽,所述调节架的外壁设置有整体放线机构。本发明通过在线路铺设的过程中,同时对线路的上下土壤进行处理,将沟渠中存在一些石块进行同步的收集处理,进而防止线路表面的胶皮出现破损,受潮损坏,提高了线路的使用寿命。
Communication line laying device
The invention relates to the technical field of line laying, in particular to a communication line laying device which comprises a fourth connecting plate, first connecting rods are rotatably connected to the outer walls of the two sides of the end, away from a supporting frame, of a first connecting plate, and first sliding plates are fixedly connected to the outer walls of the two first connecting rods. The first sliding plate is located below the line winding drum, the first sliding plate is slidably connected with the inner wall of the bottom plate, a stop lever is arranged above the door plate, a plurality of height adjusting grooves which are evenly distributed are formed in the side wall of the adjusting frame, and an overall pay-off mechanism is arranged on the outer wall of the adjusting frame. In the line laying process, soil above and below the line is treated at the same time, some stones existing in a ditch are synchronously collected and treated, then rubber on the surface of the line is prevented from being damaged and affected with damp, and the service life of the line is prolonged.
本发明涉及线路铺设技术领域,具体涉及一种通讯线路铺设装置,包括第四连接板,所述第一连接板远离支撑架的一端两侧外壁均转动连接有第一连接杆,两个所述第一连接杆的外壁均固定连接有第一滑板,所述第一滑板位于线路卷筒的下方,所述第一滑板与底板的内壁滑动连接,所述门板的上方设置有挡杆,所述调节架的侧壁开设有若干均匀分布的高度调节槽,所述调节架的外壁设置有整体放线机构。本发明通过在线路铺设的过程中,同时对线路的上下土壤进行处理,将沟渠中存在一些石块进行同步的收集处理,进而防止线路表面的胶皮出现破损,受潮损坏,提高了线路的使用寿命。
Communication line laying device
一种通讯线路铺设装置
LI PENGHUI (author) / GAO YANG (author) / KONG LANLAN (author) / GAO XIANGYU (author) / LIU XIAO (author) / SONG QIAN (author) / TIAN CONGHUI (author) / WANG HUIPING (author) / YUN YIJIE (author) / LIN LISHU (author)
2024-06-07
Patent
Electronic Resource
Chinese
IPC:
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
B65H
HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
,
Handhaben von dünnem oder fadenförmigem Gut, z.B. Folien, Bahnen, Kabeln
/
E02F
Baggern
,
DREDGING
Road marking line laying equipment with uniform marking line laying thickness
European Patent Office | 2021
|