A platform for research: civil engineering, architecture and urbanism
Soft rock cutting high slope anchor rod prefabricated groove protection structure and working method thereof
The invention discloses a soft rock cutting high slope anchor rod prefabricated groove protection structure and a working method thereof.The soft rock cutting high slope anchor rod prefabricated groove protection structure comprises a fluctuating high slope, a prefabricated groove protection mechanism arranged on the fluctuating high slope and a retaining wall arranged at the bottom of the fluctuating high slope; the prefabricated groove protection mechanism comprises a plurality of anchoring assemblies and a plurality of supporting assemblies connected between the anchoring assemblies, each anchoring assembly comprises a pedestal perpendicularly arranged on the fluctuating high slope, and short anchor rods and landslide check blocks are arranged to be connected with plug nuts. The landslide stopping block bears falling soil blocks and falling rocks to drive the short anchor rod to slide outwards, the short anchor rod falls off and slides before the long anchor rod, the landslide stopping assembly is unfolded to weaken the pressure of the landslide, the elastic net bag is unfolded along with sliding of the short anchor rod to hold the sliding soil blocks and the falling rocks, and losses caused by the landslide and the falling rocks are reduced to the maximum extent.
本发明公开了软岩路堑高边坡锚杆预制槽防护结构及其工作方法,其中软岩路堑高边坡锚杆预制槽防护结构,包括起伏高边坡、设置在起伏高边坡上的预制槽防护机构和设置在起伏高边坡底部的挡土墙,所述预制槽防护机构包括多个锚固组件和多个连接于锚固组件之间的支撑组件,所述锚固组件包括垂直设置于起伏高边坡上的台座,通过设置短锚杆和滑坡挡块均与堵头螺母连接,当发生滑坡和落石,滑坡挡块承受下落土块和落石向外带动短锚杆滑动,短锚杆在长锚杆之前脱落滑动并展开滑坡阻挡组件用以减弱滑坡的压力,弹性网兜随短锚杆滑动而展开,用以兜住滑落的土块和落石,最大限度地减少滑坡和落石带来的损失。
Soft rock cutting high slope anchor rod prefabricated groove protection structure and working method thereof
The invention discloses a soft rock cutting high slope anchor rod prefabricated groove protection structure and a working method thereof.The soft rock cutting high slope anchor rod prefabricated groove protection structure comprises a fluctuating high slope, a prefabricated groove protection mechanism arranged on the fluctuating high slope and a retaining wall arranged at the bottom of the fluctuating high slope; the prefabricated groove protection mechanism comprises a plurality of anchoring assemblies and a plurality of supporting assemblies connected between the anchoring assemblies, each anchoring assembly comprises a pedestal perpendicularly arranged on the fluctuating high slope, and short anchor rods and landslide check blocks are arranged to be connected with plug nuts. The landslide stopping block bears falling soil blocks and falling rocks to drive the short anchor rod to slide outwards, the short anchor rod falls off and slides before the long anchor rod, the landslide stopping assembly is unfolded to weaken the pressure of the landslide, the elastic net bag is unfolded along with sliding of the short anchor rod to hold the sliding soil blocks and the falling rocks, and losses caused by the landslide and the falling rocks are reduced to the maximum extent.
本发明公开了软岩路堑高边坡锚杆预制槽防护结构及其工作方法,其中软岩路堑高边坡锚杆预制槽防护结构,包括起伏高边坡、设置在起伏高边坡上的预制槽防护机构和设置在起伏高边坡底部的挡土墙,所述预制槽防护机构包括多个锚固组件和多个连接于锚固组件之间的支撑组件,所述锚固组件包括垂直设置于起伏高边坡上的台座,通过设置短锚杆和滑坡挡块均与堵头螺母连接,当发生滑坡和落石,滑坡挡块承受下落土块和落石向外带动短锚杆滑动,短锚杆在长锚杆之前脱落滑动并展开滑坡阻挡组件用以减弱滑坡的压力,弹性网兜随短锚杆滑动而展开,用以兜住滑落的土块和落石,最大限度地减少滑坡和落石带来的损失。
Soft rock cutting high slope anchor rod prefabricated groove protection structure and working method thereof
软岩路堑高边坡锚杆预制槽防护结构及其工作方法
WANG JIJING (author) / QI SHUANGXING (author) / XU SHIXIANG (author) / ZHANG HUALIN (author)
2024-06-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cutting high slope anchor rod prefabricated groove protection structure
European Patent Office | 2023
|Soft rock high slope anchor rod supporting system and method
European Patent Office | 2022
|Rock cutting slope protection structure and construction method
European Patent Office | 2024
|