A platform for research: civil engineering, architecture and urbanism
On-site modular construction method of electric construction platform foundation
The invention discloses an on-site modular construction method for an electric construction platform foundation, which comprises the following steps: S1) calculating the bearing capacity of a foundation according to load characteristics to obtain the concrete strength grade and a reinforcement form; s2) determining the exact position of a platform foundation according to the arrangement form of the construction platform; s3) for the hardened ground, base leveling only needs to be carried out on the ground; the non-hardened ground is subjected to soil body pretreatment and tamping treatment; s4) then carrying out paying-off operation; (S5) cushion layer concrete pouring is conducted, and calendaring treatment is conducted after initial setting; s6) building a mold; s7) binding a foundation slab reinforcement cage; (S8) concrete is poured, so that the concrete is formed; and S9) demolding, watering and maintaining to reach the specified strength of the foundation. According to the on-site modular construction method for the electric construction platform foundation, the requirements of foundation bearing capacity, punching resistance and the like can be met, the method is suitable for the grounds with different properties, and high application and popularization value is achieved.
本发明公开了一种电动施工平台基础的现场模块化施工方法,包括如下步骤:S1)根据荷载特点对基础地基承载力进行计算,得到混凝土强度等级以及配筋形式;S2)根据施工平台的布置形式,确定平台基础的确切位置;S3)对硬化地面,仅需在地面进行底座找平;对于非硬化地面进行土体预处理及夯实处理;S4)接着进行放线操作;S5)接着进行垫层砼浇筑,初凝后进行压光处理;S6)搭设模具;S7)绑扎基础底板钢筋笼;S8)浇筑混凝土,使混凝土成型;S9)脱模,浇水养护至基础指定强度。本发明提供的电动施工平台基础的现场模块化施工方法,能够满足地基承载力,抗冲切等要求,适应不同性质的地面,具有较高的推广应用价值。
On-site modular construction method of electric construction platform foundation
The invention discloses an on-site modular construction method for an electric construction platform foundation, which comprises the following steps: S1) calculating the bearing capacity of a foundation according to load characteristics to obtain the concrete strength grade and a reinforcement form; s2) determining the exact position of a platform foundation according to the arrangement form of the construction platform; s3) for the hardened ground, base leveling only needs to be carried out on the ground; the non-hardened ground is subjected to soil body pretreatment and tamping treatment; s4) then carrying out paying-off operation; (S5) cushion layer concrete pouring is conducted, and calendaring treatment is conducted after initial setting; s6) building a mold; s7) binding a foundation slab reinforcement cage; (S8) concrete is poured, so that the concrete is formed; and S9) demolding, watering and maintaining to reach the specified strength of the foundation. According to the on-site modular construction method for the electric construction platform foundation, the requirements of foundation bearing capacity, punching resistance and the like can be met, the method is suitable for the grounds with different properties, and high application and popularization value is achieved.
本发明公开了一种电动施工平台基础的现场模块化施工方法,包括如下步骤:S1)根据荷载特点对基础地基承载力进行计算,得到混凝土强度等级以及配筋形式;S2)根据施工平台的布置形式,确定平台基础的确切位置;S3)对硬化地面,仅需在地面进行底座找平;对于非硬化地面进行土体预处理及夯实处理;S4)接着进行放线操作;S5)接着进行垫层砼浇筑,初凝后进行压光处理;S6)搭设模具;S7)绑扎基础底板钢筋笼;S8)浇筑混凝土,使混凝土成型;S9)脱模,浇水养护至基础指定强度。本发明提供的电动施工平台基础的现场模块化施工方法,能够满足地基承载力,抗冲切等要求,适应不同性质的地面,具有较高的推广应用价值。
On-site modular construction method of electric construction platform foundation
一种电动施工平台基础的现场模块化施工方法
2024-06-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile foundation construction platform and pile foundation construction method
European Patent Office | 2020
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2023
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2024
|Modular Construction/Off-Site Construction
ASCE | 2023
|Fabricated pile foundation construction platform and pile foundation construction method
European Patent Office | 2022
|