A platform for research: civil engineering, architecture and urbanism
The invention relates to the field of integrated drainage, and provides an integrated drainage pump station which comprises a concrete base, an integrated shaft is fixed to the top wall of the concrete base, an access hole is formed in the middle of the top wall of the integrated shaft, a lifting hook hole is formed in the access hole, and first slings are arranged at the left end and the right end of the bottom of the lifting hook hole correspondingly; the tail ends of the two first slings are fixedly connected with second slings, sling chain systems are arranged in the two second slings, the output ends of the sling chain systems are fixedly connected with a sewage pump, a lifting lug is fixedly connected to the upper middle portion of one side of the outer wall of the integrated shaft, and one end of the integrated shaft is fixedly connected with a grating guide rail. And a grating lifting rope is connected into the grating guide rail in a sliding manner. By means of the structural design of the integrated flood drainage pump station, overhaul, maintenance and operation are more convenient, large-particle matter is effectively prevented from entering through the application of the smashing type grating, and the performance and reliability of a drainage system are improved.
本申请涉及一体排涝领域,提供了一体化排涝泵站,包括混凝土底座,所述混凝土底座的顶壁固定有一体化井筒,所述一体化井筒的顶壁中部开设有检修口,所述检修口的内部设置有吊钩孔,所述吊钩孔的底部左右端均设置有吊索一,两个所述吊索一的末端均固定连接有吊索二,两个所述吊索二的内部设置有吊链系统,所述吊链系统的输出端固定连接有排污泵,所述一体化井筒外壁一侧中上部固定连接有吊耳,所述的一端固定连接有格栅导轨,所述格栅导轨的内部滑动连接有格栅提索。通过一体化排涝泵站的结构设计使得检修、维护和运行更加方便,并通过粉碎型格栅的应用有效地防止大颗粒物质的进入,提高排水系统的性能和可靠性。
The invention relates to the field of integrated drainage, and provides an integrated drainage pump station which comprises a concrete base, an integrated shaft is fixed to the top wall of the concrete base, an access hole is formed in the middle of the top wall of the integrated shaft, a lifting hook hole is formed in the access hole, and first slings are arranged at the left end and the right end of the bottom of the lifting hook hole correspondingly; the tail ends of the two first slings are fixedly connected with second slings, sling chain systems are arranged in the two second slings, the output ends of the sling chain systems are fixedly connected with a sewage pump, a lifting lug is fixedly connected to the upper middle portion of one side of the outer wall of the integrated shaft, and one end of the integrated shaft is fixedly connected with a grating guide rail. And a grating lifting rope is connected into the grating guide rail in a sliding manner. By means of the structural design of the integrated flood drainage pump station, overhaul, maintenance and operation are more convenient, large-particle matter is effectively prevented from entering through the application of the smashing type grating, and the performance and reliability of a drainage system are improved.
本申请涉及一体排涝领域,提供了一体化排涝泵站,包括混凝土底座,所述混凝土底座的顶壁固定有一体化井筒,所述一体化井筒的顶壁中部开设有检修口,所述检修口的内部设置有吊钩孔,所述吊钩孔的底部左右端均设置有吊索一,两个所述吊索一的末端均固定连接有吊索二,两个所述吊索二的内部设置有吊链系统,所述吊链系统的输出端固定连接有排污泵,所述一体化井筒外壁一侧中上部固定连接有吊耳,所述的一端固定连接有格栅导轨,所述格栅导轨的内部滑动连接有格栅提索。通过一体化排涝泵站的结构设计使得检修、维护和运行更加方便,并通过粉碎型格栅的应用有效地防止大颗粒物质的进入,提高排水系统的性能和可靠性。
Integrated flood drainage pump station
一体化排涝泵站
CAO XUEJUN (author)
2024-06-11
Patent
Electronic Resource
Chinese
IPC:
E03F
SEWERS
,
Abwasserkanäle
European Patent Office | 2022
|