A platform for research: civil engineering, architecture and urbanism
Prestressed steel pipe truss laminated slab shelving assembly and construction process
The invention discloses a prestressed steel pipe truss laminated slab shelving assembly and a construction technology, and relates to the technical field of fabricated buildings, the prestressed steel pipe truss laminated slab shelving assembly comprises a supporting pipe, and a square pipe is slidably arranged on the supporting pipe; a lifting plate is slidably arranged on the supporting pipe, a plurality of pressing rods are fixedly arranged on the lifting plate, a plurality of pushing blocks are arranged on the supporting pipe, inclined grooves are formed in the pushing blocks, the pressing rods correspond to the inclined grooves in a one-to-one mode, and the pressing rods are slidably arranged in the inclined grooves; when a force storage plate slides downwards, the lifting plate is subjected to force storage, in the process, a square pipe does not slide, the lifting plate is released while the force storage plate fixes a supporting pipe, the lifting plate is made to move downwards, through cooperation of a pressing rod and an inclined groove, a pushing block slides to extrude a first spring, and under the action of reset force of the first spring, the lifting plate is pushed to move downwards. And the square pipe slightly slides to abut against the precast beam, so that the supporting pipe is prevented from shaking when being fixed, and the slurry leakage phenomenon occurring during concrete pouring is reduced.
本发明公开了一种预应力钢管桁架叠合板搁置组件及施工工艺,涉及装配式建筑技术领域,包括支撑管,支撑管上滑动设置有方管;支撑管上滑动设置有升降板,升降板上固定设置有多个压杆,支撑管设置有多个推块,多个推块上均设置有斜槽,多个压杆与多个斜槽一一对应,且压杆滑动设置于斜槽内;蓄力板在向下滑动时,对升降板进行蓄力,此过程方管不滑动,在蓄力板完成对支撑管的固定的同时,会对升降板进行释放,使升降板下移,并通过压杆与斜槽的配合,使推块滑动对第一弹簧进行挤压,在第一弹簧复位力的作用下,使方管轻微滑动与预制梁抵紧,防止在对支撑管进行固定时,支撑管晃动,减少了在混凝土浇筑时出现的漏浆现象。
Prestressed steel pipe truss laminated slab shelving assembly and construction process
The invention discloses a prestressed steel pipe truss laminated slab shelving assembly and a construction technology, and relates to the technical field of fabricated buildings, the prestressed steel pipe truss laminated slab shelving assembly comprises a supporting pipe, and a square pipe is slidably arranged on the supporting pipe; a lifting plate is slidably arranged on the supporting pipe, a plurality of pressing rods are fixedly arranged on the lifting plate, a plurality of pushing blocks are arranged on the supporting pipe, inclined grooves are formed in the pushing blocks, the pressing rods correspond to the inclined grooves in a one-to-one mode, and the pressing rods are slidably arranged in the inclined grooves; when a force storage plate slides downwards, the lifting plate is subjected to force storage, in the process, a square pipe does not slide, the lifting plate is released while the force storage plate fixes a supporting pipe, the lifting plate is made to move downwards, through cooperation of a pressing rod and an inclined groove, a pushing block slides to extrude a first spring, and under the action of reset force of the first spring, the lifting plate is pushed to move downwards. And the square pipe slightly slides to abut against the precast beam, so that the supporting pipe is prevented from shaking when being fixed, and the slurry leakage phenomenon occurring during concrete pouring is reduced.
本发明公开了一种预应力钢管桁架叠合板搁置组件及施工工艺,涉及装配式建筑技术领域,包括支撑管,支撑管上滑动设置有方管;支撑管上滑动设置有升降板,升降板上固定设置有多个压杆,支撑管设置有多个推块,多个推块上均设置有斜槽,多个压杆与多个斜槽一一对应,且压杆滑动设置于斜槽内;蓄力板在向下滑动时,对升降板进行蓄力,此过程方管不滑动,在蓄力板完成对支撑管的固定的同时,会对升降板进行释放,使升降板下移,并通过压杆与斜槽的配合,使推块滑动对第一弹簧进行挤压,在第一弹簧复位力的作用下,使方管轻微滑动与预制梁抵紧,防止在对支撑管进行固定时,支撑管晃动,减少了在混凝土浇筑时出现的漏浆现象。
Prestressed steel pipe truss laminated slab shelving assembly and construction process
一种预应力钢管桁架叠合板搁置组件及施工工艺
GUO XIAOCUN (author) / HAN HONGWEN (author) / WANG YUNTONG (author) / MA LIANG (author)
2024-06-11
Patent
Electronic Resource
Chinese
Prestressed concrete steel pipe truss laminated slab construction auxiliary device
European Patent Office | 2022
|Supporting structure for prestressed steel pipe truss laminated slab
European Patent Office | 2024
|Grouting corrugated steel pipe truss prestressed concrete laminated slab and construction method
European Patent Office | 2024
|