Anti-slide pile one-time forming pouring construction method
The invention discloses an anti-slide pile one-time forming pouring construction method, and relates to the technical field of building construction. The method comprises the following steps that a shaping mold is fixed to a pile hole; erecting a pouring platform at the top of the shaping mold; pouring is conducted in the pile hole, and slurry in the pile hole suspends on the concrete slurry under the impact of concrete; the rising condition of the liquid level in the pile hole is observed, when the interior of the pile hole is also about to rise to the position of the shaping mold, the baffle is opened, and slurry suspended on the surface of concrete slurry flows out of the slurry outlet till no slurry exists on the surface of the slurry in the pile hole; closing the baffle plate, and continuously pouring into the pile hole until the liquid level of the slurry reaches the height required by the foundation pile; removing the shaping mold after the strength of the formed foundation pile meets the requirement; in the pouring process, the baffle is opened, slurry suspending on the surface of concrete slurry can flow out of the slurry outlet, the slurry outlet is sealed through the baffle after the slurry suspending on the surface is completely discharged from the slurry outlet, equipment used on site can be reduced, and site construction is more convenient.
本发明公开了一种抗滑桩一次成型浇筑施工方法,涉及建筑施工技术领域,采用以下方法:将定型模具固定在桩孔上;在定型模具顶部搭设浇筑平台;向桩孔内浇筑,桩孔内泥浆在混凝土的冲击下悬浮在混凝土浆液上面;观察桩孔内液面上升情况,当桩孔内也快上升到定型模具的位置时,打开挡板,混凝土浆液表面上悬浮的泥浆从出浆口流出,直至桩孔内浆液表面没有泥浆;关闭挡板,向桩孔内持续浇筑,直至浆液液面到达基桩要求的高度;基桩成型后强度达到要求后拆除定型模具;在浇筑过程中将挡板打开,悬浮在混凝土浆液表面的泥浆浆液会从出浆口流出,等到表面悬浮的泥浆完全从出浆口排出后使用挡板将出浆口封闭,能够减少现场使用的设备,现场施工更加方便。
Anti-slide pile one-time forming pouring construction method
The invention discloses an anti-slide pile one-time forming pouring construction method, and relates to the technical field of building construction. The method comprises the following steps that a shaping mold is fixed to a pile hole; erecting a pouring platform at the top of the shaping mold; pouring is conducted in the pile hole, and slurry in the pile hole suspends on the concrete slurry under the impact of concrete; the rising condition of the liquid level in the pile hole is observed, when the interior of the pile hole is also about to rise to the position of the shaping mold, the baffle is opened, and slurry suspended on the surface of concrete slurry flows out of the slurry outlet till no slurry exists on the surface of the slurry in the pile hole; closing the baffle plate, and continuously pouring into the pile hole until the liquid level of the slurry reaches the height required by the foundation pile; removing the shaping mold after the strength of the formed foundation pile meets the requirement; in the pouring process, the baffle is opened, slurry suspending on the surface of concrete slurry can flow out of the slurry outlet, the slurry outlet is sealed through the baffle after the slurry suspending on the surface is completely discharged from the slurry outlet, equipment used on site can be reduced, and site construction is more convenient.
本发明公开了一种抗滑桩一次成型浇筑施工方法,涉及建筑施工技术领域,采用以下方法:将定型模具固定在桩孔上;在定型模具顶部搭设浇筑平台;向桩孔内浇筑,桩孔内泥浆在混凝土的冲击下悬浮在混凝土浆液上面;观察桩孔内液面上升情况,当桩孔内也快上升到定型模具的位置时,打开挡板,混凝土浆液表面上悬浮的泥浆从出浆口流出,直至桩孔内浆液表面没有泥浆;关闭挡板,向桩孔内持续浇筑,直至浆液液面到达基桩要求的高度;基桩成型后强度达到要求后拆除定型模具;在浇筑过程中将挡板打开,悬浮在混凝土浆液表面的泥浆浆液会从出浆口流出,等到表面悬浮的泥浆完全从出浆口排出后使用挡板将出浆口封闭,能够减少现场使用的设备,现场施工更加方便。
Anti-slide pile one-time forming pouring construction method
抗滑桩一次成型浇筑施工方法
MA YAOYU (author) / WANG YONGJIAN (author) / XU YONGPING (author) / ZHAO JIYE (author) / HUANG BIN (author) / WANG ZUODAO (author) / CHU XU (author) / ZHOU XIANGYOU (author) / LUO KUN (author) / ZHONG ZHIBO (author)
2024-06-14
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Concrete pouring device in slide-resistant pile construction
European Patent Office | 2024
|Anti-slide pile and construction method of anti-slide pile
European Patent Office | 2024
|