A platform for research: civil engineering, architecture and urbanism
Earth outlet channel for earthwork construction in foundation pit and construction method of earth outlet channel
The invention relates to the technical field of foundation pit earthwork construction, and discloses an unearthed channel for earthwork construction in a foundation pit, the unearthed channel comprises a winch and a hanging basket, the unearthed channel further comprises a plurality of mutually spliced guide rails, guide grooves are formed in the guide rails in a penetrating mode, and the hanging basket is slidably installed in the guide grooves; the guide rail is connected with a first sliding assembly and a second sliding assembly, the first sliding assembly comprises a first sliding part, the second sliding assembly comprises a second sliding part, a first sliding groove and a second sliding groove are formed in the face, away from the guide groove, of the guide rail, an arc-shaped groove is formed in one end of the guide rail, and one end of the arc-shaped groove communicates with one end of the first sliding groove. When the second sliding piece slides out of the second sliding groove, the first sliding piece is located in the first sliding groove, the first connecting rod is hinged to the guide rail, a notch is formed in the end, provided with the arc-shaped groove, of the guide rail, and when the first sliding piece slides into the arc-shaped groove, the guide rail enters the notch. According to the invention, the unearthed channel can be quickly extended.
本申请涉及基坑土方施工的技术领域,公开了基坑内土方施工的出土通道,包括卷扬机和吊篮,还包括若干个相互拼接的导轨,导轨上贯穿开设有导槽,吊篮滑动安装于导槽内;导轨连接有第一滑动组件和第二滑动组件,第一滑动组件包括第一滑动件,第二滑动组件包括第二滑动件,导轨背离导槽的一面开设有第一滑槽和第二滑槽,导轨的一端开设有弧形槽,弧形槽的一端与第一滑槽的一端连通,当第二滑动件滑出第二滑槽时,第一滑动件位于所述第一滑槽内,第一连杆铰接于所述导轨上,所述导轨开设有弧形槽的一端设置有缺口,当第一滑动件滑入弧形槽内时,所述导轨进入缺口内。本申请可以快速延长出土通道。
Earth outlet channel for earthwork construction in foundation pit and construction method of earth outlet channel
The invention relates to the technical field of foundation pit earthwork construction, and discloses an unearthed channel for earthwork construction in a foundation pit, the unearthed channel comprises a winch and a hanging basket, the unearthed channel further comprises a plurality of mutually spliced guide rails, guide grooves are formed in the guide rails in a penetrating mode, and the hanging basket is slidably installed in the guide grooves; the guide rail is connected with a first sliding assembly and a second sliding assembly, the first sliding assembly comprises a first sliding part, the second sliding assembly comprises a second sliding part, a first sliding groove and a second sliding groove are formed in the face, away from the guide groove, of the guide rail, an arc-shaped groove is formed in one end of the guide rail, and one end of the arc-shaped groove communicates with one end of the first sliding groove. When the second sliding piece slides out of the second sliding groove, the first sliding piece is located in the first sliding groove, the first connecting rod is hinged to the guide rail, a notch is formed in the end, provided with the arc-shaped groove, of the guide rail, and when the first sliding piece slides into the arc-shaped groove, the guide rail enters the notch. According to the invention, the unearthed channel can be quickly extended.
本申请涉及基坑土方施工的技术领域,公开了基坑内土方施工的出土通道,包括卷扬机和吊篮,还包括若干个相互拼接的导轨,导轨上贯穿开设有导槽,吊篮滑动安装于导槽内;导轨连接有第一滑动组件和第二滑动组件,第一滑动组件包括第一滑动件,第二滑动组件包括第二滑动件,导轨背离导槽的一面开设有第一滑槽和第二滑槽,导轨的一端开设有弧形槽,弧形槽的一端与第一滑槽的一端连通,当第二滑动件滑出第二滑槽时,第一滑动件位于所述第一滑槽内,第一连杆铰接于所述导轨上,所述导轨开设有弧形槽的一端设置有缺口,当第一滑动件滑入弧形槽内时,所述导轨进入缺口内。本申请可以快速延长出土通道。
Earth outlet channel for earthwork construction in foundation pit and construction method of earth outlet channel
基坑内土方施工的出土通道及其施工方法
WANG YAO (author) / GUO XIAO (author) / TU MINJIE (author) / WU LONGSHAN (author) / CHENG SUJUAN (author) / SHEN YABO (author) / HUANG ZHAOHUA (author) / CHEN JUNYONG (author)
2024-06-14
Patent
Electronic Resource
Chinese
Construction site earth filling device for building construction facilitating earthwork collection
European Patent Office | 2021
Earthwork construction method for gallery road foundation
European Patent Office | 2022
|British Library Conference Proceedings | 1995
|Foundation pit group earthwork construction auxiliary ramp
European Patent Office | 2023
|