A platform for research: civil engineering, architecture and urbanism
Supporting device for precise connection construction of overweight prefabricated columns
The invention relates to the technical field of prefabricated column supporting and aims to solve the problems that according to an existing prefabricated column supporting mode, fixing embedded parts need to be reserved on a prefabricated column and a floor, the influence of the prefabricated column embedded parts on later column decoration is large, later construction is inconvenient, and the prefabricated column shakes seriously in the installation stage. The supporting device for precise connection construction of the overweight prefabricated column comprises prefabricated column circumferential clamping parts clamped to the middle portion and the lower portion of the prefabricated column respectively, and the prefabricated column circumferential clamping parts and the prefabricated column circumferential clamping parts are connected through a fixing rod. The prefabricated column circumferential clamping part comprises a first clamping piece and a second clamping piece, the first clamping piece and the second clamping piece jointly surround and are clamped in the outer circumferential direction of the prefabricated column, and the first clamping piece and the second clamping piece are connected through a clamping piece fixing plug pin; each edge of the prefabricated column circumferential clamping part located in the middle of the prefabricated column is connected with a concrete floor through a first supporting leg; and each edge of the prefabricated column circumferential clamping component positioned at the lower part of the prefabricated column is connected with the corresponding first supporting leg through a second supporting leg.
本发明涉及预制柱支撑技术领域,旨在解决现有的预制柱支撑方式需在预制柱及楼板上预留固定埋件,预制柱埋件对后期柱体装饰装修影响较大,不便于后期施工,以及预制柱在安装阶段晃动较大的问题,提供一种用于超重预制柱精准连接施工的支撑装置,包括分别卡接在预制柱中部和下部的预制柱周向卡接部件,二者通过固定杆相连接;预制柱周向卡接部件包括第一卡件和第二卡件,第一卡件和第二卡件共同包围并卡箍在预制柱的外部周向上,第一卡件和第二卡件之间通过卡件固定插销连接;位于预制柱中部的预制柱周向卡接部件的各边分别通过第一支撑腿与混凝土楼板连接;位于预制柱下部的预制柱周向卡接部件的各边分别通过第二支撑腿与对应的第一支撑腿连接。
Supporting device for precise connection construction of overweight prefabricated columns
The invention relates to the technical field of prefabricated column supporting and aims to solve the problems that according to an existing prefabricated column supporting mode, fixing embedded parts need to be reserved on a prefabricated column and a floor, the influence of the prefabricated column embedded parts on later column decoration is large, later construction is inconvenient, and the prefabricated column shakes seriously in the installation stage. The supporting device for precise connection construction of the overweight prefabricated column comprises prefabricated column circumferential clamping parts clamped to the middle portion and the lower portion of the prefabricated column respectively, and the prefabricated column circumferential clamping parts and the prefabricated column circumferential clamping parts are connected through a fixing rod. The prefabricated column circumferential clamping part comprises a first clamping piece and a second clamping piece, the first clamping piece and the second clamping piece jointly surround and are clamped in the outer circumferential direction of the prefabricated column, and the first clamping piece and the second clamping piece are connected through a clamping piece fixing plug pin; each edge of the prefabricated column circumferential clamping part located in the middle of the prefabricated column is connected with a concrete floor through a first supporting leg; and each edge of the prefabricated column circumferential clamping component positioned at the lower part of the prefabricated column is connected with the corresponding first supporting leg through a second supporting leg.
本发明涉及预制柱支撑技术领域,旨在解决现有的预制柱支撑方式需在预制柱及楼板上预留固定埋件,预制柱埋件对后期柱体装饰装修影响较大,不便于后期施工,以及预制柱在安装阶段晃动较大的问题,提供一种用于超重预制柱精准连接施工的支撑装置,包括分别卡接在预制柱中部和下部的预制柱周向卡接部件,二者通过固定杆相连接;预制柱周向卡接部件包括第一卡件和第二卡件,第一卡件和第二卡件共同包围并卡箍在预制柱的外部周向上,第一卡件和第二卡件之间通过卡件固定插销连接;位于预制柱中部的预制柱周向卡接部件的各边分别通过第一支撑腿与混凝土楼板连接;位于预制柱下部的预制柱周向卡接部件的各边分别通过第二支撑腿与对应的第一支撑腿连接。
Supporting device for precise connection construction of overweight prefabricated columns
一种用于超重预制柱精准连接施工的支撑装置
ZHAO XINGSONG (author) / CHEN DASHU (author) / DU XU (author) / CAO QIU (author) / ZHOU CHAO (author) / WANG JINLONG (author) / HOU GUOTAO (author) / DANG BAISUO (author) / WANG JIN (author) / LUO RUIXIONG (author)
2024-06-14
Patent
Electronic Resource
Chinese
Segmented construction method for overweight prefabricated stairs
European Patent Office | 2023
|Supporting device for prefabricated building construction
European Patent Office | 2024
|Supporting mechanism for prefabricated building prefabricated wallboard construction
European Patent Office | 2024
|