A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of alpine desertification sand control, and discloses a sand barrier sand fixation method and device for alpine desertification sand control, and the sand barrier sand fixation method for alpine desertification sand control comprises the following steps: step 1, manufacturing a straw mat; 2, dividing the straw mat into a plurality of straw rows; thirdly, grass lattice sand barriers are laid; the sand barrier sand stabilization device for alpine desertification sand control comprises a rack shell, a combined discharging mechanism and a rhombus laying mechanism. According to the method, firstly, an existing sand barrier construction method is changed, forage is pretreated, straw mats which are uniform in thickness and orderly arranged are produced, mechanical production is basically not affected by manual efficiency, the forage laying process of constructors is shortened, and the construction time of the constructors is shortened; then, a desert tractor or a desert crawler in the prior art is adopted to be matched with the sand barrier sand fixing device for alpine desertification sand damage control, so that the grass rows are automatically laid, and the processes of manual laying and forage insertion are reduced.
本发明涉及高寒荒漠化沙害治理技术领域,且公开了一种高寒荒漠化沙害治理用沙障固沙方法及装置,一种高寒荒漠化沙害治理用沙障固沙方法包括以下步骤:步骤一、制造草帘;步骤二、将上述草帘分割成若干个草排;步骤三、铺设草格沙障;高寒荒漠化沙害治理用沙障固沙装置包括机架外壳、组合式排料机构和菱形铺设机构;本发明,首先通过改变现有的沙障施工方法,草料进行预处理,生产厚度均匀整齐排列的草帘,机械生产,基本不受人工效率的影响,减少施工人员铺设草料的过程和施工时间,然后采用现有技术中的沙漠用拖拉机或者沙漠用履带车配合本申请提出的高寒荒漠化沙害治理用沙障固沙装置对草排进行自动化铺设,减少了工人铺设和插入草料的过程。
The invention relates to the technical field of alpine desertification sand control, and discloses a sand barrier sand fixation method and device for alpine desertification sand control, and the sand barrier sand fixation method for alpine desertification sand control comprises the following steps: step 1, manufacturing a straw mat; 2, dividing the straw mat into a plurality of straw rows; thirdly, grass lattice sand barriers are laid; the sand barrier sand stabilization device for alpine desertification sand control comprises a rack shell, a combined discharging mechanism and a rhombus laying mechanism. According to the method, firstly, an existing sand barrier construction method is changed, forage is pretreated, straw mats which are uniform in thickness and orderly arranged are produced, mechanical production is basically not affected by manual efficiency, the forage laying process of constructors is shortened, and the construction time of the constructors is shortened; then, a desert tractor or a desert crawler in the prior art is adopted to be matched with the sand barrier sand fixing device for alpine desertification sand damage control, so that the grass rows are automatically laid, and the processes of manual laying and forage insertion are reduced.
本发明涉及高寒荒漠化沙害治理技术领域,且公开了一种高寒荒漠化沙害治理用沙障固沙方法及装置,一种高寒荒漠化沙害治理用沙障固沙方法包括以下步骤:步骤一、制造草帘;步骤二、将上述草帘分割成若干个草排;步骤三、铺设草格沙障;高寒荒漠化沙害治理用沙障固沙装置包括机架外壳、组合式排料机构和菱形铺设机构;本发明,首先通过改变现有的沙障施工方法,草料进行预处理,生产厚度均匀整齐排列的草帘,机械生产,基本不受人工效率的影响,减少施工人员铺设草料的过程和施工时间,然后采用现有技术中的沙漠用拖拉机或者沙漠用履带车配合本申请提出的高寒荒漠化沙害治理用沙障固沙装置对草排进行自动化铺设,减少了工人铺设和插入草料的过程。
Sand fixation method and device for sand barrier for alpine desertification sand control
一种高寒荒漠化沙害治理用沙障固沙方法及装置
JIA LIZHI (author)
2024-06-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Printing barrier desertification control method and 3D sand-made sand barrier thereof
European Patent Office | 2023
|Wind prevention and sand fixation device for desertification control
European Patent Office | 2023
|Sand fixation plate mold, sand fixation plate and manufacturing method of sand fixation plate
European Patent Office | 2020
|