A platform for research: civil engineering, architecture and urbanism
Aluminum formwork I-steel cantilever layer formwork system and construction method thereof
The invention provides an aluminum formwork I-steel cantilever layer formwork system and a construction method thereof, and belongs to the field of building construction. According to the technical scheme, the connecting structure comprises an outer wall aluminum formwork and an inner wall aluminum formwork which are arranged on the inner side and the outer side of a wall body, I-shaped steel is arranged on the outer wall aluminum formwork, a connecting steel formwork is arranged at the end of the I-shaped steel, and a mounting opening corresponding to the connecting steel formwork is formed in the bottom of the outer wall aluminum formwork; a plurality of through first mounting holes are formed in the connecting steel formwork, a plurality of second mounting holes corresponding to the first mounting holes in position are formed in the inner wall aluminum formwork, mounting screws are arranged in the first mounting holes and the second mounting holes, and the mounting screws penetrate through the first mounting holes and the second mounting holes. The I-shaped steel has the advantages that the I-shaped steel is attached to the main body structure through the connecting steel formwork, the length of traditional I-shaped steel is reduced, the I-shaped steel position main body structure is formed at a time, and later I-shaped steel hole blocking is avoided.
本发明提供了一种铝模工字钢悬挑层模板系统及其施工方法,属于建筑施工领域。其技术方案为:包括墙体内外两侧的外墙铝模板和内墙铝模板,外墙铝模板上设置有工字钢,工字钢端部设置有连接钢模板,外墙铝模板底部开设有对应连接钢模板的安装口,连接钢模板设置在安装口中,连接钢模板开设有若干贯穿的第一安装孔,内墙铝模板开设有若干与第一安装孔位置对应的第二安装孔,第一安装孔和第二安装孔中设置有安装螺杆,安装螺杆贯穿第一安装孔和第二安装孔。本发明的有益效果为:本发明工字钢通过连接钢模板与主体结构附着,减少传统工字钢长度,减少工字钢用量,同时工字钢位置主体结构一次成型,免除后期封堵工字钢洞口。
Aluminum formwork I-steel cantilever layer formwork system and construction method thereof
The invention provides an aluminum formwork I-steel cantilever layer formwork system and a construction method thereof, and belongs to the field of building construction. According to the technical scheme, the connecting structure comprises an outer wall aluminum formwork and an inner wall aluminum formwork which are arranged on the inner side and the outer side of a wall body, I-shaped steel is arranged on the outer wall aluminum formwork, a connecting steel formwork is arranged at the end of the I-shaped steel, and a mounting opening corresponding to the connecting steel formwork is formed in the bottom of the outer wall aluminum formwork; a plurality of through first mounting holes are formed in the connecting steel formwork, a plurality of second mounting holes corresponding to the first mounting holes in position are formed in the inner wall aluminum formwork, mounting screws are arranged in the first mounting holes and the second mounting holes, and the mounting screws penetrate through the first mounting holes and the second mounting holes. The I-shaped steel has the advantages that the I-shaped steel is attached to the main body structure through the connecting steel formwork, the length of traditional I-shaped steel is reduced, the I-shaped steel position main body structure is formed at a time, and later I-shaped steel hole blocking is avoided.
本发明提供了一种铝模工字钢悬挑层模板系统及其施工方法,属于建筑施工领域。其技术方案为:包括墙体内外两侧的外墙铝模板和内墙铝模板,外墙铝模板上设置有工字钢,工字钢端部设置有连接钢模板,外墙铝模板底部开设有对应连接钢模板的安装口,连接钢模板设置在安装口中,连接钢模板开设有若干贯穿的第一安装孔,内墙铝模板开设有若干与第一安装孔位置对应的第二安装孔,第一安装孔和第二安装孔中设置有安装螺杆,安装螺杆贯穿第一安装孔和第二安装孔。本发明的有益效果为:本发明工字钢通过连接钢模板与主体结构附着,减少传统工字钢长度,减少工字钢用量,同时工字钢位置主体结构一次成型,免除后期封堵工字钢洞口。
Aluminum formwork I-steel cantilever layer formwork system and construction method thereof
一种铝模工字钢悬挑层模板系统及其施工方法
WANG QINGLIN (author) / LIU ZONGWU (author) / ZHANG GUOHUI (author) / XIA QING (author) / WANG XUEGANG (author) / HUANG ZHE (author) / SHEN YOUSHUAI (author) / WANG CHAO (author) / LIANG QIXIN (author) / LI YU (author)
2024-06-18
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|Engineering Index Backfile | 1952
|European Patent Office | 2020
|