Pile repairing structure for damaged pile foundation in construction period of high-pile wharf and construction method of pile repairing structure
The pile repairing structure comprises a plurality of rows of pile repairing foundations, and each row of pile repairing foundations comprises a first repairing pile, a second repairing pile, a third repairing pile, a fourth repairing pile, a fifth repairing pile and a sixth repairing pile. The first patching pile and the second patching pile are symmetrically arranged on the upstream and downstream of the first damaged pile respectively; the pile top position of the third supplementary pile is the same as the pile top position of the second damaged pile, and the pile tip position of the third supplementary pile is located on the center line of the bent frame; the pile top position of the fourth patching pile is the same as that of the third damaged pile, and the pile tip position of the fourth patching pile is located on the center line of the bent frame; the pile top position of the fifth patching pile is the same as that of the fourth damaged pile; and the pile top position of the sixth repairing pile is the same as the pile top position of the fifth damaged pile. According to the pile repairing structure, piles are repaired at the center line position of the original bent frame of the wharf, construction is convenient and fast, it is guaranteed that the distance between the bent frames of the wharf is not changed, engineering investment is greatly saved, and the construction period is shortened.
本发明公开了一种高桩码头施工期桩基受损的补桩结构及其施工方法,该结构包括若干排补桩桩基,每排补桩桩基包括第一补桩、第二补桩、第三补桩、第四补桩、第五补桩以及第六补桩,第一补桩和第二补桩分别设置于第一受损桩的上、下游呈对称布置;第三补桩的桩顶位置与第二受损桩的桩顶位置相同,第三补桩的桩尖位置位于排架中心线上;第四补桩的桩顶位置与第三受损桩的桩顶位置相同,第四补桩的桩尖位置位于排架中心线上;第五补桩的桩顶位置与第四受损桩的桩顶位置相同;第六补桩的桩顶位置与第五受损桩的桩顶位置相同。本发明的补桩结构在码头原排架中心线位补桩,施工便捷,保证了码头排架间距不变,大大节约工程投资,缩短施工工期。
Pile repairing structure for damaged pile foundation in construction period of high-pile wharf and construction method of pile repairing structure
The pile repairing structure comprises a plurality of rows of pile repairing foundations, and each row of pile repairing foundations comprises a first repairing pile, a second repairing pile, a third repairing pile, a fourth repairing pile, a fifth repairing pile and a sixth repairing pile. The first patching pile and the second patching pile are symmetrically arranged on the upstream and downstream of the first damaged pile respectively; the pile top position of the third supplementary pile is the same as the pile top position of the second damaged pile, and the pile tip position of the third supplementary pile is located on the center line of the bent frame; the pile top position of the fourth patching pile is the same as that of the third damaged pile, and the pile tip position of the fourth patching pile is located on the center line of the bent frame; the pile top position of the fifth patching pile is the same as that of the fourth damaged pile; and the pile top position of the sixth repairing pile is the same as the pile top position of the fifth damaged pile. According to the pile repairing structure, piles are repaired at the center line position of the original bent frame of the wharf, construction is convenient and fast, it is guaranteed that the distance between the bent frames of the wharf is not changed, engineering investment is greatly saved, and the construction period is shortened.
本发明公开了一种高桩码头施工期桩基受损的补桩结构及其施工方法,该结构包括若干排补桩桩基,每排补桩桩基包括第一补桩、第二补桩、第三补桩、第四补桩、第五补桩以及第六补桩,第一补桩和第二补桩分别设置于第一受损桩的上、下游呈对称布置;第三补桩的桩顶位置与第二受损桩的桩顶位置相同,第三补桩的桩尖位置位于排架中心线上;第四补桩的桩顶位置与第三受损桩的桩顶位置相同,第四补桩的桩尖位置位于排架中心线上;第五补桩的桩顶位置与第四受损桩的桩顶位置相同;第六补桩的桩顶位置与第五受损桩的桩顶位置相同。本发明的补桩结构在码头原排架中心线位补桩,施工便捷,保证了码头排架间距不变,大大节约工程投资,缩短施工工期。
Pile repairing structure for damaged pile foundation in construction period of high-pile wharf and construction method of pile repairing structure
一种高桩码头施工期桩基受损的补桩结构及其施工方法
XU WEIJUN (author) / WU HONGXIA (author) / XIANG GUANGWEN (author)
2024-06-25
Patent
Electronic Resource
Chinese
Pile foundation pile repairing construction technology under existing pile foundation condition
European Patent Office | 2024
|Tubular pile guide device for wharf pile foundation structure construction
European Patent Office | 2023
|Pile repairing structure and pile repairing method for few-pile position of engineering pile
European Patent Office | 2023
|Method for repairing fracture damage of wharf pile foundation
European Patent Office | 2023
|