A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of building steel structure installation, in particular to building steel structure assembly construction and installation equipment which comprises a frame body, a plurality of installation bases are arranged in the frame body from top to bottom at equal intervals, and the front sides of the installation bases are provided with rod locking mechanisms used for locking reinforcing transverse rods. The rod locking mechanisms and the distance adjusting mechanisms are used in cooperation, manual work can be automatically replaced to conduct synchronous and equidistant positioning on the multiple sets of reinforcing cross rods, the distance between the reinforcing cross rods can be adjusted according to the specific height of a steel structure, the positioning precision is improved, and the positioning precision is improved. Compared with installation and positioning of a single reinforcing cross rod, on the basis that the installation efficiency of the steel structure reinforcing cross rods is guaranteed, the installation quality of the steel structure reinforcing cross rods can be further guaranteed, the overall structural stability of a steel structure is effectively improved, meanwhile, the safety coefficient in the installation stage is high, and the installation efficiency is high. And safety accidents are not easy to generate.
本发明涉及建筑钢结构安装技术领域,特别涉及一种建筑钢结构组件施工安装设备,包括框体,所述框体内部由上至下等距排布若干安装座,安装座的前侧设有用于对加强横杆进行锁紧的锁杆机构,若干安装座共同设有用于调整相邻两安装座间距的调距机构,本发明所采用的锁杆机构和调距机构配合使用,能够自动化代替人工对多组加强横杆进行同步等距定位,可以根据钢结构的具体高度调整加强横杆的间距,并且保证各加强横杆的间距相同,相比单根加强横杆的安装定位,本设备在保证钢结构加强横杆安装效率的基础上,又能进一步保证钢结构加强横杆的安装质量,有效提高钢结构的整体结构稳定性,同时安装阶段安全系数高,不易产生安全事故。
The invention relates to the technical field of building steel structure installation, in particular to building steel structure assembly construction and installation equipment which comprises a frame body, a plurality of installation bases are arranged in the frame body from top to bottom at equal intervals, and the front sides of the installation bases are provided with rod locking mechanisms used for locking reinforcing transverse rods. The rod locking mechanisms and the distance adjusting mechanisms are used in cooperation, manual work can be automatically replaced to conduct synchronous and equidistant positioning on the multiple sets of reinforcing cross rods, the distance between the reinforcing cross rods can be adjusted according to the specific height of a steel structure, the positioning precision is improved, and the positioning precision is improved. Compared with installation and positioning of a single reinforcing cross rod, on the basis that the installation efficiency of the steel structure reinforcing cross rods is guaranteed, the installation quality of the steel structure reinforcing cross rods can be further guaranteed, the overall structural stability of a steel structure is effectively improved, meanwhile, the safety coefficient in the installation stage is high, and the installation efficiency is high. And safety accidents are not easy to generate.
本发明涉及建筑钢结构安装技术领域,特别涉及一种建筑钢结构组件施工安装设备,包括框体,所述框体内部由上至下等距排布若干安装座,安装座的前侧设有用于对加强横杆进行锁紧的锁杆机构,若干安装座共同设有用于调整相邻两安装座间距的调距机构,本发明所采用的锁杆机构和调距机构配合使用,能够自动化代替人工对多组加强横杆进行同步等距定位,可以根据钢结构的具体高度调整加强横杆的间距,并且保证各加强横杆的间距相同,相比单根加强横杆的安装定位,本设备在保证钢结构加强横杆安装效率的基础上,又能进一步保证钢结构加强横杆的安装质量,有效提高钢结构的整体结构稳定性,同时安装阶段安全系数高,不易产生安全事故。
Construction installation equipment for building steel structure assembly
一种建筑钢结构组件施工安装设备
YAO JIAN (author)
2024-06-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2020
|European Patent Office | 2024
|Prefabricated steel structure building installation construction process
European Patent Office | 2022
|Prefabricated steel structure building installation construction technology
European Patent Office | 2024
|Construction method for assembly type steel structure building ALC wallboard installation joint
European Patent Office | 2024
|