A platform for research: civil engineering, architecture and urbanism
The invention provides a fabricated wall column connecting structure, relates to the technical field of building structures, and can improve the mounting efficiency of the fabricated wall column connecting structure. The fabricated wall column connecting structure comprises a prefabricated column, a prefabricated wall and a connecting piece, the connecting piece comprises two first plates oppositely arranged in the first direction and two second plates oppositely arranged in the gravity direction, and a first containing space is defined by the two first plates and the two second plates; the first accommodating space is used for partial structures of the prefabricated wall and the prefabricated column; a first sleeve is pre-buried in the first wall, close to the prefabricated wall, of the prefabricated column, the first sleeve protrudes out of the first wall in the mounting direction of the prefabricated column, a first connecting rod is pre-buried in the second wall, close to the prefabricated column, of the prefabricated wall, and the first connecting rod protrudes out of the second wall in the mounting direction of the prefabricated wall. The first sleeve is provided with a first groove with an opening facing the first connecting rod, and at least part of the first connecting rod is contained in the first groove.
本申请提供了一种装配式墙柱连接结构,涉及建筑结构技术领域,能够提高该装配式墙柱连接结构的安装效率。该装配式墙柱连接结构包括:预制柱、预制墙和连接件,连接件包括沿第一方向相对设置的两个第一板,以及沿重力方向相对设置的两个第二板,两个第一板与两个第二板围合形成第一容纳空间,第一容纳空间用于所述预制墙和预制柱的部分结构;预制柱的靠近预制墙的第一壁预埋有第一套筒,第一套筒沿预制柱的安装方向凸出于第一壁,预制墙的靠近预制柱的第二壁预埋有第一连接杆,第一连接杆沿预制墙的安装方向凸出于第二壁,第一套筒设置有开口朝向第一连接杆的第一凹槽,第一连接杆的至少部分容纳于第一凹槽。
The invention provides a fabricated wall column connecting structure, relates to the technical field of building structures, and can improve the mounting efficiency of the fabricated wall column connecting structure. The fabricated wall column connecting structure comprises a prefabricated column, a prefabricated wall and a connecting piece, the connecting piece comprises two first plates oppositely arranged in the first direction and two second plates oppositely arranged in the gravity direction, and a first containing space is defined by the two first plates and the two second plates; the first accommodating space is used for partial structures of the prefabricated wall and the prefabricated column; a first sleeve is pre-buried in the first wall, close to the prefabricated wall, of the prefabricated column, the first sleeve protrudes out of the first wall in the mounting direction of the prefabricated column, a first connecting rod is pre-buried in the second wall, close to the prefabricated column, of the prefabricated wall, and the first connecting rod protrudes out of the second wall in the mounting direction of the prefabricated wall. The first sleeve is provided with a first groove with an opening facing the first connecting rod, and at least part of the first connecting rod is contained in the first groove.
本申请提供了一种装配式墙柱连接结构,涉及建筑结构技术领域,能够提高该装配式墙柱连接结构的安装效率。该装配式墙柱连接结构包括:预制柱、预制墙和连接件,连接件包括沿第一方向相对设置的两个第一板,以及沿重力方向相对设置的两个第二板,两个第一板与两个第二板围合形成第一容纳空间,第一容纳空间用于所述预制墙和预制柱的部分结构;预制柱的靠近预制墙的第一壁预埋有第一套筒,第一套筒沿预制柱的安装方向凸出于第一壁,预制墙的靠近预制柱的第二壁预埋有第一连接杆,第一连接杆沿预制墙的安装方向凸出于第二壁,第一套筒设置有开口朝向第一连接杆的第一凹槽,第一连接杆的至少部分容纳于第一凹槽。
Fabricated wall column connecting structure
装配式墙柱连接结构
2024-07-02
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated light steel concrete wall column connecting structure
European Patent Office | 2024
|Fabricated steel structure building wall and column connecting structure
European Patent Office | 2023
|European Patent Office | 2023
|Beam column connecting piece, beam column connecting structure and fabricated building
European Patent Office | 2024
|