Construction method of single-tower wide cast-in-place box girder tower girder consolidation area
The invention relates to a construction method for a single-tower wide cast-in-place box girder tower girder consolidation area. The construction method comprises the following steps that an embedded hole is reserved in a bearing platform; the steel pipe stand columns are welded to the bearing platform, and then bottom formworks are laid on the steel pipe stand columns and the pier columns; a water bag fixing chessboard type steel frame is installed in a construction site; a top plate detachable rail laser ultrasonic double-system paving system is installed, and an I-shaped steel rail is arranged; and a wide cast-in-place box girder moving formwork is installed, and a cast-in-place box girder is poured on the top of the pier column. The construction method has the beneficial effects that the pre-buried holes are formed in the bearing platform, and the micro concave surfaces are arranged on the pre-buried steel plate groups in the pre-buried holes, so that the welding efficiency of the steel pipe piles and the pre-buried steel plate groups can be improved, a good supporting effect is achieved, and potential safety hazards of construction are reduced; the water bags are fixed through the water bag fixing chessboard type steel frame, the water bag fixing device has good applicability to a construction site with abundant water resources, and the chessboard type steel frame has high overall rigidity and can well fix the water bags at the same time.
本发明涉及一种独塔宽幅现浇箱梁塔梁固结区的施工方法,包括以下步骤:在承台上预留预埋孔;将钢管立柱焊接在承台上,随后在钢管立柱和墩柱上铺设底模板;在施工场地内安装水袋固定棋盘式钢框格;安装顶板可拆式轨道激光超声波双系统摊铺体系,设置工字钢轨道;安装宽幅现浇箱梁移动模架,在墩柱顶部浇筑现浇箱梁。本发明的有益效果是:通过在承台上施做有预埋孔,在预埋孔内的预埋钢板群设置有微凹面,可提高钢管桩和预埋钢板群的焊接效率,且具有良好的支撑效果,降低施工的安全隐患;通过水袋固定棋盘式钢框格固定水袋,对于水资源充沛的施工现场具有良好的适用性,棋盘式钢框架具有较强整体刚度的同时还可以较好地固定水袋。
Construction method of single-tower wide cast-in-place box girder tower girder consolidation area
The invention relates to a construction method for a single-tower wide cast-in-place box girder tower girder consolidation area. The construction method comprises the following steps that an embedded hole is reserved in a bearing platform; the steel pipe stand columns are welded to the bearing platform, and then bottom formworks are laid on the steel pipe stand columns and the pier columns; a water bag fixing chessboard type steel frame is installed in a construction site; a top plate detachable rail laser ultrasonic double-system paving system is installed, and an I-shaped steel rail is arranged; and a wide cast-in-place box girder moving formwork is installed, and a cast-in-place box girder is poured on the top of the pier column. The construction method has the beneficial effects that the pre-buried holes are formed in the bearing platform, and the micro concave surfaces are arranged on the pre-buried steel plate groups in the pre-buried holes, so that the welding efficiency of the steel pipe piles and the pre-buried steel plate groups can be improved, a good supporting effect is achieved, and potential safety hazards of construction are reduced; the water bags are fixed through the water bag fixing chessboard type steel frame, the water bag fixing device has good applicability to a construction site with abundant water resources, and the chessboard type steel frame has high overall rigidity and can well fix the water bags at the same time.
本发明涉及一种独塔宽幅现浇箱梁塔梁固结区的施工方法,包括以下步骤:在承台上预留预埋孔;将钢管立柱焊接在承台上,随后在钢管立柱和墩柱上铺设底模板;在施工场地内安装水袋固定棋盘式钢框格;安装顶板可拆式轨道激光超声波双系统摊铺体系,设置工字钢轨道;安装宽幅现浇箱梁移动模架,在墩柱顶部浇筑现浇箱梁。本发明的有益效果是:通过在承台上施做有预埋孔,在预埋孔内的预埋钢板群设置有微凹面,可提高钢管桩和预埋钢板群的焊接效率,且具有良好的支撑效果,降低施工的安全隐患;通过水袋固定棋盘式钢框格固定水袋,对于水资源充沛的施工现场具有良好的适用性,棋盘式钢框架具有较强整体刚度的同时还可以较好地固定水袋。
Construction method of single-tower wide cast-in-place box girder tower girder consolidation area
独塔宽幅现浇箱梁塔梁固结区的施工方法
MA XINYING (author) / CHENG HAIBO (author) / SHU WENHAI (author) / ZHANG ZHANG (author) / WU YAGUANG (author) / YANG FEIYUE (author) / WANG LUO (author) / LI MINGHUI (author)
2024-07-05
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Steel box girder closure construction method for pier tower girder consolidation system
European Patent Office | 2024
|European Patent Office | 2023
|European Patent Office | 2023
|Cast-in-place box girder support system and cast-in-place box girder construction method
European Patent Office | 2024
|