Reservoir bank water damage treatment system and technology
The invention relates to a reservoir bank water damage treatment system and technology. The reservoir bank water damage treatment system prevents reservoir water wave erosion, prevents reservoir water from rising and flowing back to a bank slope and prevents collapse caused by stagnant water in a reservoir bank slope body. According to the technical scheme, the reservoir bank water damage treatment method comprises the steps that in the period of the lowest reservoir water level, a reservoir bank water-level-fluctuating zone is trimmed, impurities on the slope surface are removed, rock-soil bodies are loosened, a non-return drainage pipe is installed, base layer waterproof mortar is sprayed, and surface layer vegetation concrete is laid. According to the method and the technology provided by the invention, the problem of multi-contradiction interweaving in the existing reservoir bank water destruction treatment technology is solved, and the long-term stability of the reservoir bank under the hydraulic action is maintained.
本发明涉及库岸水毁治理系统及技术,一防库水波浪侵蚀,二防库水上涨倒灌岸坡,三防库岸坡体内滞水导致塌滑。实现此库岸水毁治理方法的技术方案为:在库水位最低时段,修整库岸消落带,去除坡表杂物及松动岩土体,安装逆止排水管,喷射基层防水砂浆,铺筑面层植生混凝土。本发明提出的方法与技术解决了现行库岸水毁治理技术中面临的多重矛盾交织问题,维护库岸水力作用下的长期稳定性。
Reservoir bank water damage treatment system and technology
The invention relates to a reservoir bank water damage treatment system and technology. The reservoir bank water damage treatment system prevents reservoir water wave erosion, prevents reservoir water from rising and flowing back to a bank slope and prevents collapse caused by stagnant water in a reservoir bank slope body. According to the technical scheme, the reservoir bank water damage treatment method comprises the steps that in the period of the lowest reservoir water level, a reservoir bank water-level-fluctuating zone is trimmed, impurities on the slope surface are removed, rock-soil bodies are loosened, a non-return drainage pipe is installed, base layer waterproof mortar is sprayed, and surface layer vegetation concrete is laid. According to the method and the technology provided by the invention, the problem of multi-contradiction interweaving in the existing reservoir bank water destruction treatment technology is solved, and the long-term stability of the reservoir bank under the hydraulic action is maintained.
本发明涉及库岸水毁治理系统及技术,一防库水波浪侵蚀,二防库水上涨倒灌岸坡,三防库岸坡体内滞水导致塌滑。实现此库岸水毁治理方法的技术方案为:在库水位最低时段,修整库岸消落带,去除坡表杂物及松动岩土体,安装逆止排水管,喷射基层防水砂浆,铺筑面层植生混凝土。本发明提出的方法与技术解决了现行库岸水毁治理技术中面临的多重矛盾交织问题,维护库岸水力作用下的长期稳定性。
Reservoir bank water damage treatment system and technology
一种库岸水毁治理的系统及技术
CHEN GUANGFU (author) / LI YUJIE (author) / ZHANG GUODONG (author) / ZHANG HUA (author) / MENG YONGDONG (author) / SUN DAWEI (author) / WANG QING (author)
2024-07-12
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|Reservoir Bank Deformation Modeling: Application to Grangent Reservoir
British Library Online Contents | 2005
|Reservoir Bank Deformation Modeling: Application to Grangent Reservoir
Online Contents | 2005
|