The invention relates to the technical field of building construction, in particular to building foundation construction equipment and a construction method.The building foundation construction equipment comprises a guide rail, racks are arranged on the inner wall of the guide rail, a penetrating first sliding groove is formed in the surface of the guide rail, and a mounting notch communicating with the first sliding groove is formed in the side wall of one end of the guide rail; the concrete pouring device has the beneficial effects that the device is integrally installed on a guide rail through a front supporting leg and a rear supporting leg on the base through an installation notch and a second sliding groove, when a transfer box is full of concrete, a first motor driving shaft is driven to drive a gear to rotate, the device is moved to the pouring position, then a second motor is driven to control a rotating shaft to rotate, and concrete is poured; according to the discharging device, the discharging position of a transfer box above the device is adjusted, after adjustment is completed, a third motor and a driving shaft are driven to rotate, meanwhile, a driving block is made to rotate, the transfer box above is supported, then the transfer box is turned over through a fixing shaft in a lug plate, discharging work is completed, discharging operation is automatically conducted in the whole process, and the discharging efficiency is improved. The manpower expenditure is reduced; and meanwhile, the efficiency is improved.
本发明涉及建筑施工技术领域,具体为一种建筑基础施工设备及施工方法,包括:导轨,导轨的内壁设有齿条,导轨的表面开设有穿透的第一滑槽,导轨的一端侧壁开设有和第一滑槽连通的安装缺口;有益效果为:将底座上的前支腿和后支腿分别通过安装缺口和第二滑槽将装置整体安装在导轨上,当转接箱中接满混凝土时,驱动第一电机驱动轴带动齿轮进行转动,使装置移动至浇筑的位置,后驱动第二电机控制转轴进行转动,使装置上方的转接箱调整下料的位置,调整完成后驱动第三电机,驱动轴转动同时使驱动块进行转动,撑起上方的转接箱后通过耳板中的固定轴将转接箱进行翻转,完成下料的工作,全程自动化的进行下料的操作,较少了人力的支出同时提高了效率。
Building foundation construction equipment and construction method
The invention relates to the technical field of building construction, in particular to building foundation construction equipment and a construction method.The building foundation construction equipment comprises a guide rail, racks are arranged on the inner wall of the guide rail, a penetrating first sliding groove is formed in the surface of the guide rail, and a mounting notch communicating with the first sliding groove is formed in the side wall of one end of the guide rail; the concrete pouring device has the beneficial effects that the device is integrally installed on a guide rail through a front supporting leg and a rear supporting leg on the base through an installation notch and a second sliding groove, when a transfer box is full of concrete, a first motor driving shaft is driven to drive a gear to rotate, the device is moved to the pouring position, then a second motor is driven to control a rotating shaft to rotate, and concrete is poured; according to the discharging device, the discharging position of a transfer box above the device is adjusted, after adjustment is completed, a third motor and a driving shaft are driven to rotate, meanwhile, a driving block is made to rotate, the transfer box above is supported, then the transfer box is turned over through a fixing shaft in a lug plate, discharging work is completed, discharging operation is automatically conducted in the whole process, and the discharging efficiency is improved. The manpower expenditure is reduced; and meanwhile, the efficiency is improved.
本发明涉及建筑施工技术领域,具体为一种建筑基础施工设备及施工方法,包括:导轨,导轨的内壁设有齿条,导轨的表面开设有穿透的第一滑槽,导轨的一端侧壁开设有和第一滑槽连通的安装缺口;有益效果为:将底座上的前支腿和后支腿分别通过安装缺口和第二滑槽将装置整体安装在导轨上,当转接箱中接满混凝土时,驱动第一电机驱动轴带动齿轮进行转动,使装置移动至浇筑的位置,后驱动第二电机控制转轴进行转动,使装置上方的转接箱调整下料的位置,调整完成后驱动第三电机,驱动轴转动同时使驱动块进行转动,撑起上方的转接箱后通过耳板中的固定轴将转接箱进行翻转,完成下料的工作,全程自动化的进行下料的操作,较少了人力的支出同时提高了效率。
Building foundation construction equipment and construction method
一种建筑基础施工设备及施工方法
MA HAILONG (author) / RAN XIAORONG (author) / SHEN JINGHUI (author)
2024-07-16
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Building foundation pit construction equipment and building foundation pit construction method
European Patent Office | 2022
|House building foundation construction equipment and construction process