Construction method for installing waterproof sleeve on old wallboard structure
The invention discloses a construction method for installing a waterproof sleeve on an old wallboard structure. The construction method comprises the following steps that a to-be-constructed area is selected in the wallboard structure; chiseling away the to-be-constructed area so as to reserve a waterproof sleeve mounting space, and retaining wallboard structural steel bars; a waterproof sleeve is arranged on the peripheral side of the pipeline in a sleeving mode and installed in the installation space; a first mounting plate is mounted on the downstream face, the first mounting plate is flush with the flange ring, located on the downstream face, of the waterproof sleeve, the first mounting plate is connected with the waterproof sleeve, and a first concrete pouring space is defined by the first mounting plate and the wallboard structure; concrete is poured into the first concrete pouring space to form a first filling structure, and a second mounting plate is mounted on the upstream face and the side, close to the upstream face, of the first filling structure after a first preset time interval; formwork erecting and concrete pouring are conducted at the first preset position of the upstream face, a second filling structure is formed, and the side, away from the upstream face, of the second filling structure is flush with the flange bottom, located on the upstream face, of the waterproof sleeve; an additional waterproof layer and a waterproof protection layer are additionally arranged outside the second filling structure, and reliable engineering quality is ensured.
本发明公开了一种旧有墙板结构安装防水套管的施工方法,包括如下步骤:于墙板结构选待施工区域;对待施工区域进行凿除,以留出防水套管安装空间,且保留墙板结构钢筋;将防水套管套设于管道周侧,且安装于安装空间;于背水面安装第一安装板,第一安装板与防水套管位于背水面法兰圈齐平,且第一安装板与防水套管连接,与墙板结构围合形成第一浇砼空间;于第一浇砼空间内浇砼形成第一填充结构,间隔第一预设时间后于迎水面与第一填充结构靠近迎水面一侧安装第二安装板;于迎水面第一预设位置支模浇砼,形成第二填充结构,第二填充结构背离迎水面侧与防水套管位于迎水面法兰底齐平;第二填充结构外增设附加防水层及防水保护层,确保工程质量可靠。
Construction method for installing waterproof sleeve on old wallboard structure
The invention discloses a construction method for installing a waterproof sleeve on an old wallboard structure. The construction method comprises the following steps that a to-be-constructed area is selected in the wallboard structure; chiseling away the to-be-constructed area so as to reserve a waterproof sleeve mounting space, and retaining wallboard structural steel bars; a waterproof sleeve is arranged on the peripheral side of the pipeline in a sleeving mode and installed in the installation space; a first mounting plate is mounted on the downstream face, the first mounting plate is flush with the flange ring, located on the downstream face, of the waterproof sleeve, the first mounting plate is connected with the waterproof sleeve, and a first concrete pouring space is defined by the first mounting plate and the wallboard structure; concrete is poured into the first concrete pouring space to form a first filling structure, and a second mounting plate is mounted on the upstream face and the side, close to the upstream face, of the first filling structure after a first preset time interval; formwork erecting and concrete pouring are conducted at the first preset position of the upstream face, a second filling structure is formed, and the side, away from the upstream face, of the second filling structure is flush with the flange bottom, located on the upstream face, of the waterproof sleeve; an additional waterproof layer and a waterproof protection layer are additionally arranged outside the second filling structure, and reliable engineering quality is ensured.
本发明公开了一种旧有墙板结构安装防水套管的施工方法,包括如下步骤:于墙板结构选待施工区域;对待施工区域进行凿除,以留出防水套管安装空间,且保留墙板结构钢筋;将防水套管套设于管道周侧,且安装于安装空间;于背水面安装第一安装板,第一安装板与防水套管位于背水面法兰圈齐平,且第一安装板与防水套管连接,与墙板结构围合形成第一浇砼空间;于第一浇砼空间内浇砼形成第一填充结构,间隔第一预设时间后于迎水面与第一填充结构靠近迎水面一侧安装第二安装板;于迎水面第一预设位置支模浇砼,形成第二填充结构,第二填充结构背离迎水面侧与防水套管位于迎水面法兰底齐平;第二填充结构外增设附加防水层及防水保护层,确保工程质量可靠。
Construction method for installing waterproof sleeve on old wallboard structure
一种旧有墙板结构安装防水套管的施工方法
LI CHENGHUA (author) / WEN TINGTING (author) / WU YINGGUO (author) / GAN ZHAOHONG (author) / REN SIWEI (author) / SHI JIANDONG (author) / ZHONG HUISHU (author) / HUANG JIAJIAN (author) / SITU CONG (author) / LU ZHICONG (author)
2024-07-16
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Detachable structure for installing decorative wallboard
European Patent Office | 2021
|Wallboard panel support and method for installing a wallboard panel
European Patent Office | 2017
|