A platform for research: civil engineering, architecture and urbanism
Highway structure and paving method
The invention relates to an expressway structure and a pavement method, and belongs to the technical field of pavement pavement technology.The expressway structure is characterized in that a base layer, a lower base layer, an upper base layer and a surface layer are sequentially laid on an expressway from bottom to top, a protective fence is vertically fixed to the side of the expressway, a wave cushion layer and a connecting rod are fixed to the protective fence, and a plurality of water seepage holes are formed in the two sides of the surface layer; drainage ditches are formed under the water seepage holes, water leakage holes are formed in the bottoms of the drainage ditches, water guide pipes are connected to the water leakage holes, the other ends of the water guide pipes are connected with a water storage barrel, an arch-shaped frame is fixed between the drainage ditches on the two sides, and reinforcing ribs and supporting columns are fixed to the arch-shaped frame.
本申请涉及一种高速公路结构及铺装方法,属于路面铺装工艺的技术领域,其包括高速公路铺设由下至上依次为基层、下基层、上基层和面层,公路旁侧竖直固定防护栏,防护栏上固定有波浪垫层和连接杆,面层两侧开设有多个渗水孔,渗水孔正下方开设有排水沟,排水沟底部开设有漏水孔,漏水孔处连接导水管,导水管另一端连接储水桶,两侧排水沟之间固定拱形架,拱形架上固定加固筋和支柱,本申请具有增加高速公路结构的排水效果和对雨水的利用率的效果。
Highway structure and paving method
The invention relates to an expressway structure and a pavement method, and belongs to the technical field of pavement pavement technology.The expressway structure is characterized in that a base layer, a lower base layer, an upper base layer and a surface layer are sequentially laid on an expressway from bottom to top, a protective fence is vertically fixed to the side of the expressway, a wave cushion layer and a connecting rod are fixed to the protective fence, and a plurality of water seepage holes are formed in the two sides of the surface layer; drainage ditches are formed under the water seepage holes, water leakage holes are formed in the bottoms of the drainage ditches, water guide pipes are connected to the water leakage holes, the other ends of the water guide pipes are connected with a water storage barrel, an arch-shaped frame is fixed between the drainage ditches on the two sides, and reinforcing ribs and supporting columns are fixed to the arch-shaped frame.
本申请涉及一种高速公路结构及铺装方法,属于路面铺装工艺的技术领域,其包括高速公路铺设由下至上依次为基层、下基层、上基层和面层,公路旁侧竖直固定防护栏,防护栏上固定有波浪垫层和连接杆,面层两侧开设有多个渗水孔,渗水孔正下方开设有排水沟,排水沟底部开设有漏水孔,漏水孔处连接导水管,导水管另一端连接储水桶,两侧排水沟之间固定拱形架,拱形架上固定加固筋和支柱,本申请具有增加高速公路结构的排水效果和对雨水的利用率的效果。
Highway structure and paving method
一种高速公路结构及铺装方法
SHI ZHOU (author) / JI DECHAO (author) / DOU FENGYING (author)
2024-07-19
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
/
E03F
SEWERS
,
Abwasserkanäle
Paving Pennsylvania's straightest highway
Engineering Index Backfile | 1948
General highway conditions and paving
Engineering Index Backfile | 1928
British Library Conference Proceedings | 1996
|Regrading and paving Pacific Highway
Engineering Index Backfile | 1929
|