Pile-forming construction process for super-long cast-in-place concrete pile based on gas lift reverse circulation
The invention discloses a gas lift reverse circulation-based super-long cast-in-place concrete pile forming construction process, which comprises the following steps of: forming a hole in a first section: burying a steel casing, and forming the hole in the first section by adopting a rotary drilling rig until the hole in the first section penetrates through a silt layer; second-section hole forming is conducted, specifically, a reverse circulation drilling machine positive circulation process is adopted for hole forming of a second section till the hole depth reaches the first target depth; primary hole cleaning: lifting the drill rod to a first distance from the bottom of the hole, and cleaning the hole for the first time by adopting a positive circulation hole cleaning method; repeating the steps S2 and S3 until the hole depth reaches a second target depth; hoisting and connecting a reinforcement cage, and lowering a guide pipe; cleaning the hole for the second time; and underwater concrete pouring. The hole cleaning efficiency is greatly improved, the pile bottom sediment thickness is reduced, and the pile foundation engineering construction quality is improved.
本发明公开一种基于气举反循环的超长混凝土灌注桩成桩施工工艺,该工艺包括:第一段成孔:埋设钢护筒,采用旋挖钻机成孔第一段,直到第一段孔穿过粉砂层;第二段成孔:采用反循环钻机正循环工艺成孔第二段,直到孔深达到第一目标深度;一次清孔:提起钻杆至距离孔底第一距离,采用正循环清孔方法进行第一次清孔;重复步骤S2和S3直到孔深达到第二目标深度;吊放连接钢筋笼,下放导管;二次清孔;水下混凝土浇筑。本发明大大提高清孔效率,减小桩底沉渣厚度,提高桩基工程施工质量。
Pile-forming construction process for super-long cast-in-place concrete pile based on gas lift reverse circulation
The invention discloses a gas lift reverse circulation-based super-long cast-in-place concrete pile forming construction process, which comprises the following steps of: forming a hole in a first section: burying a steel casing, and forming the hole in the first section by adopting a rotary drilling rig until the hole in the first section penetrates through a silt layer; second-section hole forming is conducted, specifically, a reverse circulation drilling machine positive circulation process is adopted for hole forming of a second section till the hole depth reaches the first target depth; primary hole cleaning: lifting the drill rod to a first distance from the bottom of the hole, and cleaning the hole for the first time by adopting a positive circulation hole cleaning method; repeating the steps S2 and S3 until the hole depth reaches a second target depth; hoisting and connecting a reinforcement cage, and lowering a guide pipe; cleaning the hole for the second time; and underwater concrete pouring. The hole cleaning efficiency is greatly improved, the pile bottom sediment thickness is reduced, and the pile foundation engineering construction quality is improved.
本发明公开一种基于气举反循环的超长混凝土灌注桩成桩施工工艺,该工艺包括:第一段成孔:埋设钢护筒,采用旋挖钻机成孔第一段,直到第一段孔穿过粉砂层;第二段成孔:采用反循环钻机正循环工艺成孔第二段,直到孔深达到第一目标深度;一次清孔:提起钻杆至距离孔底第一距离,采用正循环清孔方法进行第一次清孔;重复步骤S2和S3直到孔深达到第二目标深度;吊放连接钢筋笼,下放导管;二次清孔;水下混凝土浇筑。本发明大大提高清孔效率,减小桩底沉渣厚度,提高桩基工程施工质量。
Pile-forming construction process for super-long cast-in-place concrete pile based on gas lift reverse circulation
一种基于气举反循环的超长混凝土灌注桩成桩施工工艺
SUN YANTAO (author) / WEN TING (author) / LI GUIGANG (author) / YANG JINQIU (author) / XIN XUEJIAN (author) / LIU YUQIAN (author) / HAN CHUNPENG (author) / YANG RONGSHENG (author) / DUAN XIAOFANG (author)
2024-07-23
Patent
Electronic Resource
Chinese
Pump lift reverse circulation device for hole cleaning of cast-in-place concrete pile
European Patent Office | 2023
|European Patent Office | 2022
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|