A platform for research: civil engineering, architecture and urbanism
Gobi desert mining area waste dump topography consolidation method
The invention relates to the technical field of waste dump safety construction, in particular to a desert gobi mining area waste dump terrain finishing method which comprises a moving device, a loosening device is arranged at the position, close to the rear end, of the top face of a flat plate of the surface of a tracked vehicle body, and transmission parts are arranged between two rotating rods and a driving part. And a cleaning device is arranged at the front end of the roof frame. According to the desert gobi mining area waste dump terrain finishing method, in the process that a double-shaft motor in a driving part is started to drive a moving device to integrally move, a transmission part can drive a structure in a loosening device to move, and a soil loosening rake in the loosening device breaks the structure of the surface of side slope soil; and after the soil becomes relatively loose, the soil is extruded by the rolling roller, so that the rolling roller distributes force more uniformly, soil particles are more tightly combined together, and the compactness and the stability of the slope surface are improved.
本发明涉及排土场安全施工技术领域,具体地说,涉及一种荒漠戈壁矿区排土场地形整理方法,包括移动装置,所述履带车体表面平板顶面靠近后端位置处设有松散装置,两根转动杆与驱动部之间均设有传动部,所述车顶框架的前端设有清理装置。该荒漠戈壁矿区排土场地形整理方法,启动驱动部中的双轴电机带动移动装置整体移动的过程中,通过传动部即可带动松散装置内部的结构发生运动,并通过松散装置中的松土钉耙打破边坡土壤表面的结构,使其变得相对松散后再通过碾压辊进行挤压,让碾压辊更均匀地分布力量,使土壤颗粒更加紧密地结合在一起,从而提高坡面的密实度和稳定性。
Gobi desert mining area waste dump topography consolidation method
The invention relates to the technical field of waste dump safety construction, in particular to a desert gobi mining area waste dump terrain finishing method which comprises a moving device, a loosening device is arranged at the position, close to the rear end, of the top face of a flat plate of the surface of a tracked vehicle body, and transmission parts are arranged between two rotating rods and a driving part. And a cleaning device is arranged at the front end of the roof frame. According to the desert gobi mining area waste dump terrain finishing method, in the process that a double-shaft motor in a driving part is started to drive a moving device to integrally move, a transmission part can drive a structure in a loosening device to move, and a soil loosening rake in the loosening device breaks the structure of the surface of side slope soil; and after the soil becomes relatively loose, the soil is extruded by the rolling roller, so that the rolling roller distributes force more uniformly, soil particles are more tightly combined together, and the compactness and the stability of the slope surface are improved.
本发明涉及排土场安全施工技术领域,具体地说,涉及一种荒漠戈壁矿区排土场地形整理方法,包括移动装置,所述履带车体表面平板顶面靠近后端位置处设有松散装置,两根转动杆与驱动部之间均设有传动部,所述车顶框架的前端设有清理装置。该荒漠戈壁矿区排土场地形整理方法,启动驱动部中的双轴电机带动移动装置整体移动的过程中,通过传动部即可带动松散装置内部的结构发生运动,并通过松散装置中的松土钉耙打破边坡土壤表面的结构,使其变得相对松散后再通过碾压辊进行挤压,让碾压辊更均匀地分布力量,使土壤颗粒更加紧密地结合在一起,从而提高坡面的密实度和稳定性。
Gobi desert mining area waste dump topography consolidation method
一种荒漠戈壁矿区排土场地形整理方法
JIN ZHENGZHONG (author) / SONG CHUNWU (author) / DAKA (author) / LI WENFENG (author)
2024-07-26
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Gobi desert mining area dumping site surface covering method
European Patent Office | 2024
|Energy-saving supply leisure facility for desert gobi oasis area
European Patent Office | 2021
|Wild animal protection system for large water conveyance canal in gobi desert area
European Patent Office | 2024
|Construction method of gobi rocky desert area framework compact type water-stable base layer
European Patent Office | 2021
|European Patent Office | 2021
|