A platform for research: civil engineering, architecture and urbanism
Indoor decoration sound insulation structure and construction method
The invention discloses an indoor decoration sound insulation structure and a construction method, and relates to the technical field of decoration sound insulation constructions.The indoor decoration sound insulation structure comprises a wall body, a fixing plate is fixedly installed on the front face of the wall body, a framework is fixedly installed on the front face of the fixing plate, a sound insulation plate is arranged on the front face of the framework, and a fixing rod is arranged at the top of the framework; a clamping mechanism is arranged at the bottom of the fixing rod; the clamping mechanism comprises a first groove, a first insertion block, a first clamping groove, a second clamping groove, a first spring and an arc-shaped block. A second inserting block is inserted into a second groove, then a clamping rod, a first inserting block and a third inserting block are aligned with a hole, a first groove and a third groove correspondingly and inserted, a movable rod is pulled, the left side of a fixed rod is pressed, so that an arc-shaped block is clamped into the first clamping groove, then the movable rod is loosened, and the left end of the movable rod is inserted into a fourth clamping groove; the installation efficiency is greatly improved, and convenience is provided for workers.
本发明公开了一种室内装修隔音结构及施工方法,涉及装修隔音结构技术领域,包括墙体,所述墙体的正面固定安装有固定板,所述固定板的正面固定安装有骨架,所述骨架的正面设置有隔音板,所述骨架的顶部设置有固定杆,所述固定杆的底部设置有卡接机构;所述卡接机构包括凹槽一、插块一、卡槽一、卡槽二、弹簧一、弧形块;本发明通过将插块二插入凹槽二的内部,再将卡杆、插块一和插块三分别对准孔洞、凹槽一和凹槽三并插入,拉动活动杆,按动固定杆的左侧,使得弧形块卡入卡槽一的内部,再松开活动杆,使得活动杆的左端插入卡槽四的内部,即可完成隔音板的安装,安装效率得到了极大的提升,为工作人员提供了便利。
Indoor decoration sound insulation structure and construction method
The invention discloses an indoor decoration sound insulation structure and a construction method, and relates to the technical field of decoration sound insulation constructions.The indoor decoration sound insulation structure comprises a wall body, a fixing plate is fixedly installed on the front face of the wall body, a framework is fixedly installed on the front face of the fixing plate, a sound insulation plate is arranged on the front face of the framework, and a fixing rod is arranged at the top of the framework; a clamping mechanism is arranged at the bottom of the fixing rod; the clamping mechanism comprises a first groove, a first insertion block, a first clamping groove, a second clamping groove, a first spring and an arc-shaped block. A second inserting block is inserted into a second groove, then a clamping rod, a first inserting block and a third inserting block are aligned with a hole, a first groove and a third groove correspondingly and inserted, a movable rod is pulled, the left side of a fixed rod is pressed, so that an arc-shaped block is clamped into the first clamping groove, then the movable rod is loosened, and the left end of the movable rod is inserted into a fourth clamping groove; the installation efficiency is greatly improved, and convenience is provided for workers.
本发明公开了一种室内装修隔音结构及施工方法,涉及装修隔音结构技术领域,包括墙体,所述墙体的正面固定安装有固定板,所述固定板的正面固定安装有骨架,所述骨架的正面设置有隔音板,所述骨架的顶部设置有固定杆,所述固定杆的底部设置有卡接机构;所述卡接机构包括凹槽一、插块一、卡槽一、卡槽二、弹簧一、弧形块;本发明通过将插块二插入凹槽二的内部,再将卡杆、插块一和插块三分别对准孔洞、凹槽一和凹槽三并插入,拉动活动杆,按动固定杆的左侧,使得弧形块卡入卡槽一的内部,再松开活动杆,使得活动杆的左端插入卡槽四的内部,即可完成隔音板的安装,安装效率得到了极大的提升,为工作人员提供了便利。
Indoor decoration sound insulation structure and construction method
一种室内装修隔音结构及施工方法
ZHANG SHOUQING (author)
2024-08-02
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Construction method of indoor sound insulation system for indoor decoration
European Patent Office | 2022
|Assembly type sound insulation wallboard for indoor decoration
European Patent Office | 2020
|Sound insulation device for decoration engineering construction
European Patent Office | 2021
|