A platform for research: civil engineering, architecture and urbanism
Rapid construction method for telescopic plastering screeding
A telescopic plastering screeding rapid construction method is characterized by comprising the following steps that a, a guiding rule is manufactured and machined in advance, the guiding rule is of a long-strip-shaped structure with the rectangular section, and screw holes are formed in the middles of the two ends of the long-strip-shaped structure; b, an aluminum square tube is provided, the length of the aluminum square tube is equal to that of the guiding rule, and screw holes matched with the screw holes of the guiding rule are formed in the two ends of the aluminum square tube so that the aluminum square tube can be fixed to the center of the guiding rule through screws; c, screeding construction is conducted according to the guiding rule, the screeding width is 20 mm, and the screeding thickness is equal to the plastering thickness; and d, when the screeding is almost completely dried, the screeding flatness is corrected through a laser level meter. The rapid construction method for the telescopic plastering screeding has the advantages that the construction tool is simple in structure and convenient to manufacture, the plastering quality is guaranteed, construction operation is convenient and rapid, the construction period is shortened, and the cost is saved.
一种可伸缩抹灰冲筋快速施工方法,其特征在于包括以下步骤:a、提前制作加工靠尺,靠尺是截面为矩形的长条形结构,长条形结构的两端中间和设有螺钉孔;b、提供铝方通,使铝方通的长度等于靠尺的长度,铝方通的两端设有与靠尺螺钉孔配合的螺钉孔,以便用螺钉将铝方通固定于靠尺的中心;c、根据靠尺进行冲筋施工,使冲筋的宽度为20mm,厚度同抹灰厚度;d、待冲筋接近干透时,用激光水平仪校正冲筋平整度。本发明的可伸缩抹灰冲筋快速施工方法具有施工用具结构简单、制作方便,保证抹灰质量,施工操作方便快捷,缩短工期和节省成本的优点。
Rapid construction method for telescopic plastering screeding
A telescopic plastering screeding rapid construction method is characterized by comprising the following steps that a, a guiding rule is manufactured and machined in advance, the guiding rule is of a long-strip-shaped structure with the rectangular section, and screw holes are formed in the middles of the two ends of the long-strip-shaped structure; b, an aluminum square tube is provided, the length of the aluminum square tube is equal to that of the guiding rule, and screw holes matched with the screw holes of the guiding rule are formed in the two ends of the aluminum square tube so that the aluminum square tube can be fixed to the center of the guiding rule through screws; c, screeding construction is conducted according to the guiding rule, the screeding width is 20 mm, and the screeding thickness is equal to the plastering thickness; and d, when the screeding is almost completely dried, the screeding flatness is corrected through a laser level meter. The rapid construction method for the telescopic plastering screeding has the advantages that the construction tool is simple in structure and convenient to manufacture, the plastering quality is guaranteed, construction operation is convenient and rapid, the construction period is shortened, and the cost is saved.
一种可伸缩抹灰冲筋快速施工方法,其特征在于包括以下步骤:a、提前制作加工靠尺,靠尺是截面为矩形的长条形结构,长条形结构的两端中间和设有螺钉孔;b、提供铝方通,使铝方通的长度等于靠尺的长度,铝方通的两端设有与靠尺螺钉孔配合的螺钉孔,以便用螺钉将铝方通固定于靠尺的中心;c、根据靠尺进行冲筋施工,使冲筋的宽度为20mm,厚度同抹灰厚度;d、待冲筋接近干透时,用激光水平仪校正冲筋平整度。本发明的可伸缩抹灰冲筋快速施工方法具有施工用具结构简单、制作方便,保证抹灰质量,施工操作方便快捷,缩短工期和节省成本的优点。
Rapid construction method for telescopic plastering screeding
一种可伸缩抹灰冲筋快速施工方法
ZHONG MANQUN (author) / LU BIN (author) / GU HENGYU (author)
2024-08-02
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
European Patent Office | 2024
|Gypsum mortar plastering wall screeding construction method
European Patent Office | 2022
|Plastering screeding positioning device for wall or ground construction
European Patent Office | 2021
|