A platform for research: civil engineering, architecture and urbanism
Roadbed structure and roadbed construction method
The invention discloses a roadbed structure and a roadbed construction method, and belongs to the technical field of roadbed construction, the roadbed structure comprises a square pit, the bottom of the square pit is a compaction layer, a backfill layer is arranged above the compaction layer, a pouring layer is arranged above the backfill layer, and a positioning area is reserved above the backfill layer and located on one side of the filling layer. By arranging the reserved positioning area, the upper road section and the lower road section can be better connected, the stability of the joint is improved, and positioning and leveling during construction of the next section are facilitated; meanwhile, a construction space can be provided for the next section of construction by means of the positioning area, and the construction efficiency of the roadbed is improved.
本发明公开了一种路基结构及路基施工方法,属于路基施工技术领域,包括方坑,方坑,方坑的底部为压实层,压实层上方为回填层,回填层的上方为浇灌层,回填层的上方位于填充层的一侧预留有定位区。本发明通过设置预留的定位区,能更好的连接上下路段,提高连接处的稳定性,也方便下一段施工时的定位和找平;同时借助定位区也能为下一段施工提供施工空间,提高路基的修建效率。
Roadbed structure and roadbed construction method
The invention discloses a roadbed structure and a roadbed construction method, and belongs to the technical field of roadbed construction, the roadbed structure comprises a square pit, the bottom of the square pit is a compaction layer, a backfill layer is arranged above the compaction layer, a pouring layer is arranged above the backfill layer, and a positioning area is reserved above the backfill layer and located on one side of the filling layer. By arranging the reserved positioning area, the upper road section and the lower road section can be better connected, the stability of the joint is improved, and positioning and leveling during construction of the next section are facilitated; meanwhile, a construction space can be provided for the next section of construction by means of the positioning area, and the construction efficiency of the roadbed is improved.
本发明公开了一种路基结构及路基施工方法,属于路基施工技术领域,包括方坑,方坑,方坑的底部为压实层,压实层上方为回填层,回填层的上方为浇灌层,回填层的上方位于填充层的一侧预留有定位区。本发明通过设置预留的定位区,能更好的连接上下路段,提高连接处的稳定性,也方便下一段施工时的定位和找平;同时借助定位区也能为下一段施工提供施工空间,提高路基的修建效率。
Roadbed structure and roadbed construction method
一种路基结构及路基施工方法
LIU HUANLIAN (author) / CHEN ZHUO (author) / CHEN KAI (author) / WANG DEXUAN (author) / CUI ZHENHU (author) / ZHANG RUHAO (author) / ZHAI JIANQUAN (author) / WANG DUODUO (author) / XIA LONGFA (author) / CHEN WANNIAN (author)
2024-08-06
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Overhead roadbed structure, roadbed assembly, roadbed system and construction method
European Patent Office | 2020
|Roadbed structure and construction method of roadbed structure
European Patent Office | 2024
|