Non-comprehensive cast-in-place pile hardened terrace system and construction method thereof
The invention discloses a non-comprehensive cast-in-place pile hardening terrace system and a construction method thereof.The non-comprehensive cast-in-place pile hardening terrace system comprises a non-hardening area arranged in a pile foundation site of cast-in-place piles, the non-hardening area comprises a plurality of bearing platform units which are arranged at intervals, slurry ditches which are arranged along the inner edges of the bearing platform units and are connected among the bearing platform units, and at least one original soil slurry making circulating pool which is arranged between at least one group of two adjacent bearing platform units and is used for communicating with the slurry ditches; each bearing platform unit internally comprises a pile group unit formed by arranging a plurality of cast-in-place piles at intervals; the hardened area is arranged in the pile foundation site of the cast-in-place pile except the non-hardened area, reinforced concrete is poured in the hardened area, the hardened area and the non-hardened area are obviously partitioned, the problem that the cast-in-place pile construction site gives consideration to site safety, civilization and image is ingeniously solved, and the cast-in-place pile has high popularization value.
本发明公开了一种非全面化灌注桩硬化地坪系统及其施工方法,非全面化灌注桩硬化地坪系统包括非硬化区,设于所述灌注桩的桩基场地内,非硬化区包括若干间隔设置的承台单元、沿若干承台单元内的边缘设置且连接于若干承台单元之间的泥浆沟,以及设于至少一组相邻的两个承台单元之间、且用于与泥浆沟连通的至少一个原土造浆循环池,每个承台单元内均包括由若干灌注桩间隔排列形成的群桩单元;硬化区,设于灌注桩的桩基场地内除非硬化区之外的区域,硬化区内浇筑有钢筋混凝土,本发明硬化区与非硬化区分区明显,巧妙地解决了灌注桩施工现场兼顾现场安全文明形象的难题,具有较高的推广价值。
Non-comprehensive cast-in-place pile hardened terrace system and construction method thereof
The invention discloses a non-comprehensive cast-in-place pile hardening terrace system and a construction method thereof.The non-comprehensive cast-in-place pile hardening terrace system comprises a non-hardening area arranged in a pile foundation site of cast-in-place piles, the non-hardening area comprises a plurality of bearing platform units which are arranged at intervals, slurry ditches which are arranged along the inner edges of the bearing platform units and are connected among the bearing platform units, and at least one original soil slurry making circulating pool which is arranged between at least one group of two adjacent bearing platform units and is used for communicating with the slurry ditches; each bearing platform unit internally comprises a pile group unit formed by arranging a plurality of cast-in-place piles at intervals; the hardened area is arranged in the pile foundation site of the cast-in-place pile except the non-hardened area, reinforced concrete is poured in the hardened area, the hardened area and the non-hardened area are obviously partitioned, the problem that the cast-in-place pile construction site gives consideration to site safety, civilization and image is ingeniously solved, and the cast-in-place pile has high popularization value.
本发明公开了一种非全面化灌注桩硬化地坪系统及其施工方法,非全面化灌注桩硬化地坪系统包括非硬化区,设于所述灌注桩的桩基场地内,非硬化区包括若干间隔设置的承台单元、沿若干承台单元内的边缘设置且连接于若干承台单元之间的泥浆沟,以及设于至少一组相邻的两个承台单元之间、且用于与泥浆沟连通的至少一个原土造浆循环池,每个承台单元内均包括由若干灌注桩间隔排列形成的群桩单元;硬化区,设于灌注桩的桩基场地内除非硬化区之外的区域,硬化区内浇筑有钢筋混凝土,本发明硬化区与非硬化区分区明显,巧妙地解决了灌注桩施工现场兼顾现场安全文明形象的难题,具有较高的推广价值。
Non-comprehensive cast-in-place pile hardened terrace system and construction method thereof
非全面化灌注桩硬化地坪系统及其施工方法
ZHOU QIANG (author) / YU HAIPENG (author) / LIN WENLIANG (author) / XIE YUNLONG (author) / YANG BIN (author) / LAI QINGLEI (author) / ZHU LEI (author) / HAN XIAONAN (author) / CHEN YANG (author) / FANG HENGSHAN (author)
2024-08-06
Patent
Electronic Resource
Chinese
Construction method of EPDM cast-in-place elastic terrace
European Patent Office | 2022
|Construction method of cast-in-place terrace rear reinforcing mesh
European Patent Office | 2024
|CAST-IN-PLACE PILE AND CONSTRUCTION METHOD OF CAST-IN-PLACE PILE
European Patent Office | 2023
|