Construction method of steel formwork for water outlet of water delivery gallery of ship lock
The invention relates to the technical field of water conservancy projects, in particular to a construction method of a steel formwork for a water outlet of a ship lock water delivery gallery. According to the technical scheme, the first steel formwork, the second steel formwork and the supporting plate are arranged, and the supporting plate is detachably arranged between the first steel formwork and the second steel formwork, so that when the water outlet of the ship lock water delivery gallery is poured, the supporting plate is fixed between the first steel formwork and the second steel formwork; and when the water outlet of the ship lock water delivery gallery is poured, the supporting plate is separated from the position between the first steel formwork and the second steel formwork, so that the first steel formwork and the second steel formwork are detached. Therefore, according to the technical scheme, the problem that demolding is difficult in the prior art can be solved.
本发明涉及水利工程技术领域,特别涉及一种用于船闸输水廊道出水口的钢模板的施工方法。该技术方案通过设置第一钢模板、第二钢模板和支撑板,支撑板可拆卸地设置于第一钢模板和第二钢模板之间,这样在进行船闸输水廊道出水口的浇筑时,支撑板固定于第一钢模板和第二钢模板之间;而在对船闸输水廊道出水口浇筑完毕时,支撑板从第一钢模板和第二钢模板之间分离,以实现第一钢模板和第二钢模板的拆除。因此,上述技术方案能够解决相关技术存在的脱模困难的问题。
Construction method of steel formwork for water outlet of water delivery gallery of ship lock
The invention relates to the technical field of water conservancy projects, in particular to a construction method of a steel formwork for a water outlet of a ship lock water delivery gallery. According to the technical scheme, the first steel formwork, the second steel formwork and the supporting plate are arranged, and the supporting plate is detachably arranged between the first steel formwork and the second steel formwork, so that when the water outlet of the ship lock water delivery gallery is poured, the supporting plate is fixed between the first steel formwork and the second steel formwork; and when the water outlet of the ship lock water delivery gallery is poured, the supporting plate is separated from the position between the first steel formwork and the second steel formwork, so that the first steel formwork and the second steel formwork are detached. Therefore, according to the technical scheme, the problem that demolding is difficult in the prior art can be solved.
本发明涉及水利工程技术领域,特别涉及一种用于船闸输水廊道出水口的钢模板的施工方法。该技术方案通过设置第一钢模板、第二钢模板和支撑板,支撑板可拆卸地设置于第一钢模板和第二钢模板之间,这样在进行船闸输水廊道出水口的浇筑时,支撑板固定于第一钢模板和第二钢模板之间;而在对船闸输水廊道出水口浇筑完毕时,支撑板从第一钢模板和第二钢模板之间分离,以实现第一钢模板和第二钢模板的拆除。因此,上述技术方案能够解决相关技术存在的脱模困难的问题。
Construction method of steel formwork for water outlet of water delivery gallery of ship lock
一种用于船闸输水廊道出水口的钢模板的施工方法
XUAN HONGZHENG (author) / ZHANG JIANCHAO (author) / LIU JUNXIANG (author) / HUANG WEI (author)
2024-08-06
Patent
Electronic Resource
Chinese
Ship lock water delivery gallery and construction method thereof
European Patent Office | 2023
|Water delivery gallery formwork structure and construction method thereof
European Patent Office | 2024
|Prefabricated vestibule structure of ship lock water delivery gallery
European Patent Office | 2024
|