A platform for research: civil engineering, architecture and urbanism
Subway construction drainage system
The invention relates to the technical field of drainage, and discloses a subway construction drainage system which comprises a drainage pipe network arranged in a channel, a water collecting pit is arranged in the channel, and a drainage mechanism is arranged in the water collecting pit; the drainage mechanism comprises a drainage frame, a waterproof water pump and a water level gauge; a drainage pipe is provided with control equipment; the drainage frame comprises a supporting frame and a filter plate, the size of the supporting frame can be adjusted through cooperation of a first frame, a second frame and a first reinforcing plate, the size of the filter plate is adjusted through cooperation of a first plate, a second plate and a second reinforcing plate, and the drainage frame is suitable for water collecting pits of different sizes and is installed in the water collecting pits. The water collecting pit can be recycled and reused after construction is completed, manual building of the water collecting pit is not needed, the economic cost of people is reduced, the drainage efficiency of the water collecting pit is improved, the drainage frame and the waterproof water pump are prevented from being blocked through the filter plate, the filter cover and the mounting cover, and the service life of the waterproof water pump is prolonged.
本发明涉及排水技术领域,公开了一种地铁施工排水系统,包括设置在通道内的排水管网,通道内设置有集水坑,集水坑中设置有排水机构;排水机构包括排水框、防水水泵和水位计,排水管的安装有控制设备;排水框包括支撑框和过滤板,通过设置的第一框架、第二框架和第一加强板配合能够调整支撑框的尺寸,第一板件、第二板件和第二加强板配合调整过滤板的尺寸,排水框适用于不同尺寸的集水坑,将排水框安装到集水坑中,施工完成可以进行回收重复使用,不需要人工砌筑集水坑,降低了人们的经济成本,提高集水坑的排水效率,通过设置的过滤板、过滤罩和安装罩,避免将排水框和防水水泵堵塞,延长了防水水泵的使用寿命。
Subway construction drainage system
The invention relates to the technical field of drainage, and discloses a subway construction drainage system which comprises a drainage pipe network arranged in a channel, a water collecting pit is arranged in the channel, and a drainage mechanism is arranged in the water collecting pit; the drainage mechanism comprises a drainage frame, a waterproof water pump and a water level gauge; a drainage pipe is provided with control equipment; the drainage frame comprises a supporting frame and a filter plate, the size of the supporting frame can be adjusted through cooperation of a first frame, a second frame and a first reinforcing plate, the size of the filter plate is adjusted through cooperation of a first plate, a second plate and a second reinforcing plate, and the drainage frame is suitable for water collecting pits of different sizes and is installed in the water collecting pits. The water collecting pit can be recycled and reused after construction is completed, manual building of the water collecting pit is not needed, the economic cost of people is reduced, the drainage efficiency of the water collecting pit is improved, the drainage frame and the waterproof water pump are prevented from being blocked through the filter plate, the filter cover and the mounting cover, and the service life of the waterproof water pump is prolonged.
本发明涉及排水技术领域,公开了一种地铁施工排水系统,包括设置在通道内的排水管网,通道内设置有集水坑,集水坑中设置有排水机构;排水机构包括排水框、防水水泵和水位计,排水管的安装有控制设备;排水框包括支撑框和过滤板,通过设置的第一框架、第二框架和第一加强板配合能够调整支撑框的尺寸,第一板件、第二板件和第二加强板配合调整过滤板的尺寸,排水框适用于不同尺寸的集水坑,将排水框安装到集水坑中,施工完成可以进行回收重复使用,不需要人工砌筑集水坑,降低了人们的经济成本,提高集水坑的排水效率,通过设置的过滤板、过滤罩和安装罩,避免将排水框和防水水泵堵塞,延长了防水水泵的使用寿命。
Subway construction drainage system
一种地铁施工排水系统
LI SHANMING (author) / NI XIANGYANG (author) / SUN YI (author) / LIU HUARONG (author)
2024-08-06
Patent
Electronic Resource
Chinese
Chicago Subway: Its drainage and plumbing
Engineering Index Backfile | 1943
Construction method for drainage and irrigation integrated precipitation adjacent to subway
European Patent Office | 2024
|