A platform for research: civil engineering, architecture and urbanism
Street-along large-span corridor structure
The invention relates to the technical field of building construction, and provides a large-span corridor structure along a street. The top plate layer is arranged above a bottom plate, the chord pipes are arranged on the two sides of the bottom plate layer and the two sides of the top plate layer, the web members are fixedly connected between the two chord pipes located on the same side, and the preassembled pipes are installed on a tower in advance and used for being connected with the chord pipes. A first slot is formed in the end face, close to the string tube, of the preassembled tube, a second slot opposite to the first slot is formed in the string tube, and a butt joint mechanism in butt joint with the string tube is arranged on the preassembled tube. The butt joint mechanism comprises a butt joint block arranged in the first inserting groove and a pushing assembly pushing the butt joint block to be inserted into the first inserting groove and the second inserting groove. The pushing assembly comprises pushing cloth inserted into the first inserting groove and a first limiting piece limiting movement of one end of the pushing cloth. The device has the effects that the butt joint time between the chord pipe and the preassembled pipe is shortened, so that the workload of workers is reduced, and potential safety hazards during high-altitude operation are reduced.
本申请涉及建筑施工的技术领域,提供了一种沿街大跨度连廊结构,其包括底板层、设置于底层板上方的顶板层、设置于底板层两侧和顶板层两侧的弦管、固定连接于位于同侧两根弦管之间的腹杆以及预先安装在塔楼上用于和弦管连接的预装管;所述预装管靠近于弦管的端面开设有第一插槽,所述弦管开设有与第一插槽相对设置的第二插槽,所述预装管上设置有与弦管进行对接的对接机构,所述对接机构包括内置于第一插槽的对接块以及推动对接块插设于第一插槽和第二插槽中的顶推组件;所述顶推组件包括插设于第一插槽的顶推布、限制顶推布的一端移动的第一限位件。本申请具有减少弦管和预装管之间的对接时间,以减少工人的工作量和高空作业时的安全隐患的效果。
Street-along large-span corridor structure
The invention relates to the technical field of building construction, and provides a large-span corridor structure along a street. The top plate layer is arranged above a bottom plate, the chord pipes are arranged on the two sides of the bottom plate layer and the two sides of the top plate layer, the web members are fixedly connected between the two chord pipes located on the same side, and the preassembled pipes are installed on a tower in advance and used for being connected with the chord pipes. A first slot is formed in the end face, close to the string tube, of the preassembled tube, a second slot opposite to the first slot is formed in the string tube, and a butt joint mechanism in butt joint with the string tube is arranged on the preassembled tube. The butt joint mechanism comprises a butt joint block arranged in the first inserting groove and a pushing assembly pushing the butt joint block to be inserted into the first inserting groove and the second inserting groove. The pushing assembly comprises pushing cloth inserted into the first inserting groove and a first limiting piece limiting movement of one end of the pushing cloth. The device has the effects that the butt joint time between the chord pipe and the preassembled pipe is shortened, so that the workload of workers is reduced, and potential safety hazards during high-altitude operation are reduced.
本申请涉及建筑施工的技术领域,提供了一种沿街大跨度连廊结构,其包括底板层、设置于底层板上方的顶板层、设置于底板层两侧和顶板层两侧的弦管、固定连接于位于同侧两根弦管之间的腹杆以及预先安装在塔楼上用于和弦管连接的预装管;所述预装管靠近于弦管的端面开设有第一插槽,所述弦管开设有与第一插槽相对设置的第二插槽,所述预装管上设置有与弦管进行对接的对接机构,所述对接机构包括内置于第一插槽的对接块以及推动对接块插设于第一插槽和第二插槽中的顶推组件;所述顶推组件包括插设于第一插槽的顶推布、限制顶推布的一端移动的第一限位件。本申请具有减少弦管和预装管之间的对接时间,以减少工人的工作量和高空作业时的安全隐患的效果。
Street-along large-span corridor structure
一种沿街大跨度连廊结构
YANG ZHENQIN (author) / GUO XIAO (author) / HUANG YAN (author) / CHENG SUJUAN (author) / ZHANG FENG (author) / JIANG NA (author) / HUANG JUANJUAN (author) / ZHENG XIAOJUN (author)
2024-08-06
Patent
Electronic Resource
Chinese
Construction method of large-span corridor arch rib and construction method of large-span corridor
European Patent Office | 2023
|Construction method of large-span steel structure corridor
European Patent Office | 2024
|Large-span steel structure corridor unit type installation method
European Patent Office | 2024
|Large-span inner court steel structure corridor sliding construction device
European Patent Office | 2023
|