A platform for research: civil engineering, architecture and urbanism
Metal mine geological safety monitoring device
The invention belongs to the technical field of metal mine monitoring devices, particularly relates to a metal mine geological safety monitoring device, and aims to solve the technical problem that a monitoring station needs long time or is unstable in fixation in the prior art. Comprising a positioning pile, a spraying part is slidably connected in the positioning pile in a sealed mode, a through hole is formed in the spraying part, the positioning pile and the spraying part are matched to form a material storage cavity and a flow guide cavity, the material storage cavity and the flow guide cavity are communicated through the through hole of the spraying part, a glue solution is stored in the material storage cavity, and the positioning pile is fixedly connected with a liquid inlet pipe communicated with the material storage cavity. The spraying piece is fixedly connected with an upper elastic piece and a lower elastic piece, and the positioning pile is provided with spraying openings distributed annularly. Glue liquid is sprayed to the ground around the burying hole through the spraying opening, the connection mode of soil particles around the burying hole is changed, the bonding force of the soil particles is enhanced, and therefore the positioning pile is fixed, and the stability of the positioning pile is guaranteed while the laying time is shortened.
本发明属于金属矿山监测装置技术领域,具体为一种金属矿山地质安全监测装置,以解决现有布设监测站所需时间长或固定不稳的技术问题。包括定位桩,定位桩内密封滑动连接有喷洒件,喷洒件设置有通孔,定位桩与所述喷洒件配合形成储料腔和导流腔,储料腔与所述导流腔之间通过所述喷洒件的通孔连通,储料腔内存放有胶液,定位桩固接有与所述储料腔连通的进液管,喷洒件固接有上弹性片和下弹性片,定位桩设置有环形分布的喷洒口。本发明通过喷洒口向埋设孔周围的地面喷洒胶液,改变埋设孔周围土壤颗粒间的联结方式,增强土壤颗粒间的粘结力,从而对定位桩进行固定,在减少布设时间的同时,保证定位桩的稳定性。
Metal mine geological safety monitoring device
The invention belongs to the technical field of metal mine monitoring devices, particularly relates to a metal mine geological safety monitoring device, and aims to solve the technical problem that a monitoring station needs long time or is unstable in fixation in the prior art. Comprising a positioning pile, a spraying part is slidably connected in the positioning pile in a sealed mode, a through hole is formed in the spraying part, the positioning pile and the spraying part are matched to form a material storage cavity and a flow guide cavity, the material storage cavity and the flow guide cavity are communicated through the through hole of the spraying part, a glue solution is stored in the material storage cavity, and the positioning pile is fixedly connected with a liquid inlet pipe communicated with the material storage cavity. The spraying piece is fixedly connected with an upper elastic piece and a lower elastic piece, and the positioning pile is provided with spraying openings distributed annularly. Glue liquid is sprayed to the ground around the burying hole through the spraying opening, the connection mode of soil particles around the burying hole is changed, the bonding force of the soil particles is enhanced, and therefore the positioning pile is fixed, and the stability of the positioning pile is guaranteed while the laying time is shortened.
本发明属于金属矿山监测装置技术领域,具体为一种金属矿山地质安全监测装置,以解决现有布设监测站所需时间长或固定不稳的技术问题。包括定位桩,定位桩内密封滑动连接有喷洒件,喷洒件设置有通孔,定位桩与所述喷洒件配合形成储料腔和导流腔,储料腔与所述导流腔之间通过所述喷洒件的通孔连通,储料腔内存放有胶液,定位桩固接有与所述储料腔连通的进液管,喷洒件固接有上弹性片和下弹性片,定位桩设置有环形分布的喷洒口。本发明通过喷洒口向埋设孔周围的地面喷洒胶液,改变埋设孔周围土壤颗粒间的联结方式,增强土壤颗粒间的粘结力,从而对定位桩进行固定,在减少布设时间的同时,保证定位桩的稳定性。
Metal mine geological safety monitoring device
一种金属矿山地质安全监测装置
DING ZHENGJIANG (author) / SUI LAILUN (author) / GUO MINGHUA (author) / YANG MINGSHUANG (author) / ZHANG HUAGUI (author) / LYU QIANG (author) / ZHANG CHANGJIANG (author) / LI ZHENJUN (author) / WANG SHANSHAN (author)
2024-08-06
Patent
Electronic Resource
Chinese
IPC:
F16M
Rahmen, Gehäuse oder Grundplatten von Kraftmaschinen oder anderen Maschinen oder von Apparaten, nicht auf eine besondere Art von Maschine oder Apparat eingeschränkt, die anderweitig vorgesehen ist
,
FRAMES, CASINGS, OR BEDS, OF ENGINES OR OTHER MACHINES OR APPARATUS, NOT SPECIFIC TO AN ENGINE, MACHINE, OR APPARATUS PROVIDED FOR ELSEWHERE
/
E02D
FOUNDATIONS
,
Gründungen
/
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
/
G01B
MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS
,
Messen der Länge, der Dicke oder ähnlicher linearer Abmessungen
/
G01C
Messen von Entfernungen, Höhen, Neigungen oder Richtungen
,
MEASURING DISTANCES, LEVELS OR BEARINGS
Prediction of Hard Brittle Geological Disasters in Metal Mine from Microseismic Monitoring
British Library Conference Proceedings | 2013
|