Large artificial ecological lake construction method
The invention relates to the technical field of artificial garden landscape construction, in particular to a large-scale artificial ecological lake construction method. A GPS is adopted for positioning and paying off, a plain soil layer is excavated, a lime soil layer is laid on the compacted bottom, then a concrete cushion layer is poured on the lime soil layer, a brick wall is built on the edge of the poured concrete cushion layer, a waterproof layer is laid on the built brick wall and the concrete cushion layer, and a concrete structure is poured on the waterproof layer. And after the concrete structure is hardened, the two sides of the brick wall are subjected to plain soil backfilling and compaction, and landscape layout is conducted in the concrete structure and on the backfilled plain soil. The waterproof layer is used for preventing water leakage and seepage, the concrete structure forms a main water containing structure and serves as a bottom structure of the artificial lake, the environment of the artificial lake can be beautified through plain soil backfilling and landscape arrangement, and the ornamental value and the ecological value are improved.
本发明涉及人工园林景观施工的技术领域,尤其是涉及一种大型人工生态湖施工方法。采用GPS进行定位放线,对素土层进行开挖,在压实的底部摊铺灰土层,然后在灰土层上浇筑混凝土垫层,在浇筑好的混凝土垫层边缘处砌筑砖墙,在砌筑好的砖墙和混凝土垫层上铺设防水层,在防水层上浇筑混凝土结构,等待混凝土结构硬化后将砖墙两侧进行素土回填并压实,在混凝土结构内和回填的素土上进行景观布设。防水层用于防漏水和防渗水,混凝土结构形成主要的盛水结构,作为人工湖的底部结构,素土回填和景观布设能够美化人工湖的环境,提高观赏价值和生态价值。
Large artificial ecological lake construction method
The invention relates to the technical field of artificial garden landscape construction, in particular to a large-scale artificial ecological lake construction method. A GPS is adopted for positioning and paying off, a plain soil layer is excavated, a lime soil layer is laid on the compacted bottom, then a concrete cushion layer is poured on the lime soil layer, a brick wall is built on the edge of the poured concrete cushion layer, a waterproof layer is laid on the built brick wall and the concrete cushion layer, and a concrete structure is poured on the waterproof layer. And after the concrete structure is hardened, the two sides of the brick wall are subjected to plain soil backfilling and compaction, and landscape layout is conducted in the concrete structure and on the backfilled plain soil. The waterproof layer is used for preventing water leakage and seepage, the concrete structure forms a main water containing structure and serves as a bottom structure of the artificial lake, the environment of the artificial lake can be beautified through plain soil backfilling and landscape arrangement, and the ornamental value and the ecological value are improved.
本发明涉及人工园林景观施工的技术领域,尤其是涉及一种大型人工生态湖施工方法。采用GPS进行定位放线,对素土层进行开挖,在压实的底部摊铺灰土层,然后在灰土层上浇筑混凝土垫层,在浇筑好的混凝土垫层边缘处砌筑砖墙,在砌筑好的砖墙和混凝土垫层上铺设防水层,在防水层上浇筑混凝土结构,等待混凝土结构硬化后将砖墙两侧进行素土回填并压实,在混凝土结构内和回填的素土上进行景观布设。防水层用于防漏水和防渗水,混凝土结构形成主要的盛水结构,作为人工湖的底部结构,素土回填和景观布设能够美化人工湖的环境,提高观赏价值和生态价值。
Large artificial ecological lake construction method
一种大型人工生态湖施工方法
PAN YONGXIANG (author) / DONG XIAODONG (author) / LI QINGSEN (author) / ZHAO PENG (author) / ZHAO ZIYI (author) / SUN CHUANHAO (author) / WU ZEWEI (author) / ZHANG DEXIN (author)
2024-08-09
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Construction method for ecological restoration of underwater forest of artificial lake
European Patent Office | 2023
|Construction method for improving water ecological habitat of artificial lake body
European Patent Office | 2023
|Ecological Design of Ternary of Artificial Landscaping Lake
British Library Conference Proceedings | 2011
|