A platform for research: civil engineering, architecture and urbanism
Grouting device for high-speed rail pile foundation construction
The invention discloses a grouting device for high-speed rail pile foundation construction, comprising: a base, the top of which is provided with a pair of slide rails in parallel at intervals; the first sliding plate stretches across the pair of sliding rails and is in sliding connection with the pair of sliding rails, and the bottom of the first sliding plate is connected with first sliding blocks in one-to-one correspondence with the pair of sliding rails; the first driving piece is used for driving the first sliding plate to slide along the sliding rail, and the first driving piece is connected to the base; the inverted-U-shaped supporting frame is connected to the top of the first sliding plate, and two flange plates of the inverted-U-shaped supporting frame are each vertically provided with a through groove; the two sides of the grouting assembly are connected with second sliding blocks in sliding fit with the two through grooves correspondingly. And the second driving piece is used for driving the grouting assembly to slide along the through groove and is connected to the first sliding plate, and the grouting device is arranged, so that the construction efficiency is improved.
本发明公开了一种高铁桩基施工用灌浆装置,包括:底座,所述底座的顶部平行间隔开设有一对滑轨;第一滑板,所述第一滑板横跨一对所述滑轨并与一对所述滑轨滑动连接,所述第一滑板底部连接有与一对所述滑轨一一对应的第一滑块;用于驱动所述第一滑板沿所述滑轨滑动的第一驱动件,所述第一驱动件连接在所述底座上;倒U型支撑架,所述倒U型支撑架连接在所述第一滑板的顶部,所述倒U型支撑架的两个翼缘板上分别竖向开设有一通槽;注浆组件,所述注浆组件的两侧分别连接有与两个所述通槽滑动配合的第二滑块;用于驱动所述注浆组件沿所述通槽滑动的第二驱动件,所述第二驱动件连接在所述第一滑板上,通过设置所述灌浆装置提高了施工效率。
Grouting device for high-speed rail pile foundation construction
The invention discloses a grouting device for high-speed rail pile foundation construction, comprising: a base, the top of which is provided with a pair of slide rails in parallel at intervals; the first sliding plate stretches across the pair of sliding rails and is in sliding connection with the pair of sliding rails, and the bottom of the first sliding plate is connected with first sliding blocks in one-to-one correspondence with the pair of sliding rails; the first driving piece is used for driving the first sliding plate to slide along the sliding rail, and the first driving piece is connected to the base; the inverted-U-shaped supporting frame is connected to the top of the first sliding plate, and two flange plates of the inverted-U-shaped supporting frame are each vertically provided with a through groove; the two sides of the grouting assembly are connected with second sliding blocks in sliding fit with the two through grooves correspondingly. And the second driving piece is used for driving the grouting assembly to slide along the through groove and is connected to the first sliding plate, and the grouting device is arranged, so that the construction efficiency is improved.
本发明公开了一种高铁桩基施工用灌浆装置,包括:底座,所述底座的顶部平行间隔开设有一对滑轨;第一滑板,所述第一滑板横跨一对所述滑轨并与一对所述滑轨滑动连接,所述第一滑板底部连接有与一对所述滑轨一一对应的第一滑块;用于驱动所述第一滑板沿所述滑轨滑动的第一驱动件,所述第一驱动件连接在所述底座上;倒U型支撑架,所述倒U型支撑架连接在所述第一滑板的顶部,所述倒U型支撑架的两个翼缘板上分别竖向开设有一通槽;注浆组件,所述注浆组件的两侧分别连接有与两个所述通槽滑动配合的第二滑块;用于驱动所述注浆组件沿所述通槽滑动的第二驱动件,所述第二驱动件连接在所述第一滑板上,通过设置所述灌浆装置提高了施工效率。
Grouting device for high-speed rail pile foundation construction
高铁桩基施工用灌浆装置
WANG WEI (author) / XIAO HAIRONG (author) / CUI YONGGANG (author) / GAO CHUNXU (author) / MU KEYONG (author) / JIA GUOQING (author)
2024-08-09
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Grouting device and grouting method for pile foundation construction
European Patent Office | 2021
|Grouting device for post-grouting construction of pile foundation
European Patent Office | 2024
|Grouting device for building pile foundation construction
European Patent Office | 2020
|Grouting construction method in pile foundation construction
European Patent Office | 2021
|