A platform for research: civil engineering, architecture and urbanism
Protective dismantling method for mosaic floor
The invention discloses a protective dismantling method for a mosaic floor. The protective dismantling method comprises the steps that first-level numbering is conducted on areas to be subjected to protective dismantling of the mosaic floor; planning transverse and longitudinal slotting lines in the to-be-protectively dismantled area, slotting downwards along the to-be-protectively dismantled area to divide the to-be-protectively dismantled area into a plurality of sub-areas, and performing second-level numbering on the sub-areas; planning transverse and longitudinal cutting lines in the sub-region, cutting downwards along the transverse and longitudinal cutting lines to divide the sub-region into a plurality of blocks, and carrying out third-level numbering on each block; a horizontal parting line is planned on a base layer below the mosaic floor according to the same thickness parallel to the surface of the floor, horizontal cutting is carried out along the horizontal parting line, all the blocks are separated and detached from the base layer, and all the blocks are horizontally cut according to the detaching route; and packaging the extracted blocks according to the third-level number, and then transporting the blocks out of the field one by one according to a planned outward transportation route so as to carry out protective dismantling on the mosaic terrace. According to the method, the yield of protective dismantling and extraction of the mosaic terrace can be improved.
本发明公开一种马赛克地坪保护性拆除方法,包括:对马赛克地坪的待保护性拆除区域进行第一级编号;在待保护性拆除区域规划横纵向开槽线并沿其向下开槽将待保护性拆除区域划分为若干个子区域,对子区域进行第二级编号;在子区域规划横纵向切割线并沿其向下切割将子区域划分为多个块体,对每个块体进行第三级编号;按平行于地坪表面的相同厚度在马赛克地坪下方的基层上规划水平分割线并沿其进行水平切割将各个块体从基层上分离拆除,将各个块体按拆除路线进行水平切割,对提取的各块体按第三级编号进行包装后根据规划的外运路线一一运输出场地之外,以对马赛克地坪进行保护性拆除。本发明能够提高马赛克地坪保护性拆除提取的成品率。
Protective dismantling method for mosaic floor
The invention discloses a protective dismantling method for a mosaic floor. The protective dismantling method comprises the steps that first-level numbering is conducted on areas to be subjected to protective dismantling of the mosaic floor; planning transverse and longitudinal slotting lines in the to-be-protectively dismantled area, slotting downwards along the to-be-protectively dismantled area to divide the to-be-protectively dismantled area into a plurality of sub-areas, and performing second-level numbering on the sub-areas; planning transverse and longitudinal cutting lines in the sub-region, cutting downwards along the transverse and longitudinal cutting lines to divide the sub-region into a plurality of blocks, and carrying out third-level numbering on each block; a horizontal parting line is planned on a base layer below the mosaic floor according to the same thickness parallel to the surface of the floor, horizontal cutting is carried out along the horizontal parting line, all the blocks are separated and detached from the base layer, and all the blocks are horizontally cut according to the detaching route; and packaging the extracted blocks according to the third-level number, and then transporting the blocks out of the field one by one according to a planned outward transportation route so as to carry out protective dismantling on the mosaic terrace. According to the method, the yield of protective dismantling and extraction of the mosaic terrace can be improved.
本发明公开一种马赛克地坪保护性拆除方法,包括:对马赛克地坪的待保护性拆除区域进行第一级编号;在待保护性拆除区域规划横纵向开槽线并沿其向下开槽将待保护性拆除区域划分为若干个子区域,对子区域进行第二级编号;在子区域规划横纵向切割线并沿其向下切割将子区域划分为多个块体,对每个块体进行第三级编号;按平行于地坪表面的相同厚度在马赛克地坪下方的基层上规划水平分割线并沿其进行水平切割将各个块体从基层上分离拆除,将各个块体按拆除路线进行水平切割,对提取的各块体按第三级编号进行包装后根据规划的外运路线一一运输出场地之外,以对马赛克地坪进行保护性拆除。本发明能够提高马赛克地坪保护性拆除提取的成品率。
Protective dismantling method for mosaic floor
一种马赛克地坪保护性拆除方法
CHEN XUEXIA (author) / ZHANG MING (author) / GU ZHIWANG (author) / SUN SHENPENG (author) / REN YINGNAN (author) / BAO LINGFEI (author) / ZHU XIAOXUAN (author) / TONG YU (author) / HE JIAO (author) / MA SIQI (author)
2024-08-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building floor dismantling supporting beam and building floor support-free dismantling method
European Patent Office | 2023
|