A platform for research: civil engineering, architecture and urbanism
Construction method for improving drainage capacity of kiwi fruit orchard
The invention discloses a construction method for improving drainage capacity of a kiwi fruit orchard, and relates to the technical field of kiwi fruit planting.The construction method comprises the steps that a planting groove is dug, a drainage pipe with holes is wrapped with geotechnical cloth and placed in the planting groove, vermiculite is filled, a water seepage net is laid, a proper culture medium is selected, the culture medium is backfilled, and drainage ditches are dug. And the drainage pipes are connected together through the drainage ditches. The method is easy to operate and master, the drainage capacity of the kiwi fruit orchard can be improved, waterlogging threats of the orchard can be relieved, soil humidity can be kept in the daily management process, the irrigation water consumption of the orchard is reduced, and safe production of the orchard and the yield and quality of fruits are guaranteed.
本发明公开了一种提高猕猴桃果园排水能力的施工方法,涉及猕猴桃种植技术领域,包括挖掘种植槽,将带孔的排水管采用土工布包裹放置到种植槽内,填充蛭石,铺设渗水网,选择合适的栽培基质,栽培基质的回填,挖掘排水沟,通过排水沟将排水管连在一起。本发明操作简单容易掌握,可以提高猕猴桃果园的排水能力,减轻果园涝害威胁,日常管理过程中可以保持土壤湿度,减少果园浇灌用水量,保障果园安全生产以及果实的产量和品质。
Construction method for improving drainage capacity of kiwi fruit orchard
The invention discloses a construction method for improving drainage capacity of a kiwi fruit orchard, and relates to the technical field of kiwi fruit planting.The construction method comprises the steps that a planting groove is dug, a drainage pipe with holes is wrapped with geotechnical cloth and placed in the planting groove, vermiculite is filled, a water seepage net is laid, a proper culture medium is selected, the culture medium is backfilled, and drainage ditches are dug. And the drainage pipes are connected together through the drainage ditches. The method is easy to operate and master, the drainage capacity of the kiwi fruit orchard can be improved, waterlogging threats of the orchard can be relieved, soil humidity can be kept in the daily management process, the irrigation water consumption of the orchard is reduced, and safe production of the orchard and the yield and quality of fruits are guaranteed.
本发明公开了一种提高猕猴桃果园排水能力的施工方法,涉及猕猴桃种植技术领域,包括挖掘种植槽,将带孔的排水管采用土工布包裹放置到种植槽内,填充蛭石,铺设渗水网,选择合适的栽培基质,栽培基质的回填,挖掘排水沟,通过排水沟将排水管连在一起。本发明操作简单容易掌握,可以提高猕猴桃果园的排水能力,减轻果园涝害威胁,日常管理过程中可以保持土壤湿度,减少果园浇灌用水量,保障果园安全生产以及果实的产量和品质。
Construction method for improving drainage capacity of kiwi fruit orchard
一种提高猕猴桃果园排水能力的施工方法
LI HONGYUN (author) / YANG HONGMEI (author) / ZHONG YUNPENG (author) / SUN LEIMING (author) / QI XIUJUAN (author) / FANG JINBAO (author) / CHEN DAMING (author) / CHEN XIA (author)
2024-08-13
Patent
Electronic Resource
Chinese
Kiwi fruit cultivation rain sheltering shed frame for preventing and controlling kiwi fruit canker
European Patent Office | 2020
|Ecological environment-friendly mechanical orchard drainage system
European Patent Office | 2022
|Fruit tree cultivation method suitable for orchard landscapes
European Patent Office | 2020
|British Library Conference Proceedings | 1997
|