Front hanging device of light bridge construction hanging basket
The invention discloses a light-weight bridge construction hanging basket front hanging device, and relates to the technical field of bridge construction, the light-weight bridge construction hanging basket front hanging device comprises a bridge floor, a fixing mechanism is arranged at the top of the bridge floor, a hanging mechanism is arranged at the top of the fixing mechanism, the fixing mechanism comprises two bases, and forward moving rails are arranged at the tops of the two bases; three rectangular openings are formed in one sides of the outer walls of the two forward-moving rails, three pressing plates are movably inserted between the opposite sides of the two forward-moving rails, each pressing plate penetrates through the corresponding rectangular opening, the two ends of the outer walls of the three pressing plates are movably sleeved with hanging plates, and two limiting plates are movably inserted in one side of the outer wall of each hanging plate; a first bolt is movably inserted into one side of the outer wall of each lifting plate, and each first bolt penetrates through the corresponding limiting plate. The device is fixed through the hydraulic rod, so that anchor bars are not needed for fixing, bar pre-embedding materials and embedding procedures are omitted, and the progress of bridge construction can be accelerated.
本发明公开了一种轻型化桥梁施工挂篮前吊挂装置,涉及桥梁施工技术领域,包括桥面,桥面的顶部设置固定机构,固定机构的顶部设置吊挂机构,固定机构包括两组底座,两组底座的顶部均放置前移轨道轨,两个前移轨道的外壁一侧均开设有三个矩形开口,两个前移轨道的相对一侧之间活动插设有三个压板,且每个压板分别贯穿每个矩形开口,三个压板的外壁两端均活动套设有吊板,且每个吊板的外壁一侧均活动插设有两个限位板,每个吊板的外壁一侧均活动插设有第一螺栓,且每个第一螺栓分别贯穿每个限位板。本装置是通过液压杆进行固定,所以就不需要锚筋进行固定,减省了预埋筋材料和埋设工序,从而能加快桥梁施工的进度。
Front hanging device of light bridge construction hanging basket
The invention discloses a light-weight bridge construction hanging basket front hanging device, and relates to the technical field of bridge construction, the light-weight bridge construction hanging basket front hanging device comprises a bridge floor, a fixing mechanism is arranged at the top of the bridge floor, a hanging mechanism is arranged at the top of the fixing mechanism, the fixing mechanism comprises two bases, and forward moving rails are arranged at the tops of the two bases; three rectangular openings are formed in one sides of the outer walls of the two forward-moving rails, three pressing plates are movably inserted between the opposite sides of the two forward-moving rails, each pressing plate penetrates through the corresponding rectangular opening, the two ends of the outer walls of the three pressing plates are movably sleeved with hanging plates, and two limiting plates are movably inserted in one side of the outer wall of each hanging plate; a first bolt is movably inserted into one side of the outer wall of each lifting plate, and each first bolt penetrates through the corresponding limiting plate. The device is fixed through the hydraulic rod, so that anchor bars are not needed for fixing, bar pre-embedding materials and embedding procedures are omitted, and the progress of bridge construction can be accelerated.
本发明公开了一种轻型化桥梁施工挂篮前吊挂装置,涉及桥梁施工技术领域,包括桥面,桥面的顶部设置固定机构,固定机构的顶部设置吊挂机构,固定机构包括两组底座,两组底座的顶部均放置前移轨道轨,两个前移轨道的外壁一侧均开设有三个矩形开口,两个前移轨道的相对一侧之间活动插设有三个压板,且每个压板分别贯穿每个矩形开口,三个压板的外壁两端均活动套设有吊板,且每个吊板的外壁一侧均活动插设有两个限位板,每个吊板的外壁一侧均活动插设有第一螺栓,且每个第一螺栓分别贯穿每个限位板。本装置是通过液压杆进行固定,所以就不需要锚筋进行固定,减省了预埋筋材料和埋设工序,从而能加快桥梁施工的进度。
Front hanging device of light bridge construction hanging basket
一种轻型化桥梁施工挂篮前吊挂装置
YE TAOPING (author) / XU WENLONG (author) / YAN TINGYUN (author) / CHEN WENQIANG (author) / LI SHOUWEN (author) / XUE YUHUI (author) / HAN FENGYAN (author) / XU YANXIA (author)
2024-08-13
Patent
Electronic Resource
Chinese