Welding-free installation method for track beam embedded part
The invention provides a welding-free installation method for a track beam embedded part, and relates to the technical field of track beam foundation bolt installation, in particular to the welding-free installation method for the track beam embedded part. Comprising the following steps that 1, an embedded part is machined, specifically, the embedded part is any one of a foundation bolt or an embedded steel plate, two foundation bolt steel bars are arranged on a horizontal base plate of the foundation bolt, a steel plate steel bar is arranged on the upper portion of the embedded steel plate, and two L-shaped threaded steel bars are arranged on the lower portion of the embedded steel plate; 2, track beam reinforcing steel bars are installed; 3, the formwork is installed and reinforced; step 4, carrying out foundation bolt position lofting; 5, the pre-embedded foundation bolts or the pre-embedded steel plates are inserted into the concrete beam; and 6, formwork removal and acceptance check are conducted, and foundation bolt steel bars and steel plate steel bars are removed. The method has the positive effects of simplifying the construction process, shortening the construction time, reducing the construction cost and improving the construction quality.
本发明所提供的轨道梁预埋件免焊接安装方法,涉及轨道梁地脚螺栓安装技术领域,具体为一种轨道梁预埋件免焊接安装方法。包括以下步骤:步骤1,加工预埋件:所述预埋件为地脚螺栓或预埋钢板中的任意一种,所述地脚螺栓的水平垫板上设置有两根地脚螺栓钢筋,所述预埋钢板的上部设置有一根钢板钢筋,预埋钢板的下部设置有两根L形螺纹钢筋;步骤2,进行轨道梁钢筋安装;步骤3,进行模板安装、加固;步骤4,进行进行地脚螺栓位置放样;步骤5,将预埋地脚螺栓或预埋钢板插入混凝土梁内;步骤6,拆模验收,剔除地脚螺栓钢筋、钢板钢筋。本发明具有简化施工工艺,缩短施工时间,降低施工成本,提高施工质量的积极效果。
Welding-free installation method for track beam embedded part
The invention provides a welding-free installation method for a track beam embedded part, and relates to the technical field of track beam foundation bolt installation, in particular to the welding-free installation method for the track beam embedded part. Comprising the following steps that 1, an embedded part is machined, specifically, the embedded part is any one of a foundation bolt or an embedded steel plate, two foundation bolt steel bars are arranged on a horizontal base plate of the foundation bolt, a steel plate steel bar is arranged on the upper portion of the embedded steel plate, and two L-shaped threaded steel bars are arranged on the lower portion of the embedded steel plate; 2, track beam reinforcing steel bars are installed; 3, the formwork is installed and reinforced; step 4, carrying out foundation bolt position lofting; 5, the pre-embedded foundation bolts or the pre-embedded steel plates are inserted into the concrete beam; and 6, formwork removal and acceptance check are conducted, and foundation bolt steel bars and steel plate steel bars are removed. The method has the positive effects of simplifying the construction process, shortening the construction time, reducing the construction cost and improving the construction quality.
本发明所提供的轨道梁预埋件免焊接安装方法,涉及轨道梁地脚螺栓安装技术领域,具体为一种轨道梁预埋件免焊接安装方法。包括以下步骤:步骤1,加工预埋件:所述预埋件为地脚螺栓或预埋钢板中的任意一种,所述地脚螺栓的水平垫板上设置有两根地脚螺栓钢筋,所述预埋钢板的上部设置有一根钢板钢筋,预埋钢板的下部设置有两根L形螺纹钢筋;步骤2,进行轨道梁钢筋安装;步骤3,进行模板安装、加固;步骤4,进行进行地脚螺栓位置放样;步骤5,将预埋地脚螺栓或预埋钢板插入混凝土梁内;步骤6,拆模验收,剔除地脚螺栓钢筋、钢板钢筋。本发明具有简化施工工艺,缩短施工时间,降低施工成本,提高施工质量的积极效果。
Welding-free installation method for track beam embedded part
轨道梁预埋件免焊接安装方法
LI PENGCHENG (author) / GAO YUEYUAN (author) / DING ZHAOLIANG (author) / CHEN CHANGSHENG (author) / KONG ZHIXIANG (author) / LIN XIANGSHUAI (author) / XU XIAOLONG (author) / SONG CHAO (author) / ZHOU XIAOJI (author) / HUANG CHAO (author)
2024-08-13
Patent
Electronic Resource
Chinese