Method for constructing dam-free pumped storage power station by using abandoned mine
The invention discloses a method for constructing a dam-free pumped storage power station by using a waste mine, and particularly relates to the field of pumped storage power station construction, which comprises the following steps: step S100, selecting an upper reservoir and a lower reservoir, and selecting a proper waste mine reservoir as the upper reservoir or the lower reservoir of the pumped storage power station; and S200, a water turbine room is built, specifically, the water turbine room is built between the upper reservoir and the lower reservoir, and a water turbine is installed in the water turbine room. The abandoned mine reservoir can be used as the upper reservoir or the lower reservoir of the pumped storage power station, so that the reservoir does not need to be excavated again, the construction time of the dam-free pumped storage power station can be effectively shortened, and the dam-free pumped storage power station can be constructed by calculating the power evaluation value, setting the power evaluation threshold value and comparing the circuit evaluation value with the power evaluation threshold value. Therefore, daily power evaluation can be well carried out, alarm processing can be carried out when the planned generating capacity is not reached, and in the power load trough period, the water pumping amount in the trough period and the power generation plan of the next day are planned.
发明公开了一种利用废弃矿井建设无坝抽水蓄能电站的方法,具体涉及抽水蓄能电站建设领域,包括如下步骤:步骤S100,选择上库和下库,选择适宜的废弃矿井库作为抽水蓄能电站的上库或者下库;步骤S200,水轮机房的建设,将水轮机房建设在上库和下库之间,水轮机房内安装水轮机。本发明可以将废弃矿井库作为抽水蓄能电站的上库或者下库,如此不需要重新开挖水库,可以有效降低无坝抽水蓄能电站的建造时间,通过计算电力评估值,并设定电力评估阀值,将电路评估值与电力评估阀值进行比较,如此可以很好的进行每日的电力评估,在未达到计划发电量时,会进行报警处理,并且在电力负荷低谷期,规划低谷期抽水量和次日发电计划。
Method for constructing dam-free pumped storage power station by using abandoned mine
The invention discloses a method for constructing a dam-free pumped storage power station by using a waste mine, and particularly relates to the field of pumped storage power station construction, which comprises the following steps: step S100, selecting an upper reservoir and a lower reservoir, and selecting a proper waste mine reservoir as the upper reservoir or the lower reservoir of the pumped storage power station; and S200, a water turbine room is built, specifically, the water turbine room is built between the upper reservoir and the lower reservoir, and a water turbine is installed in the water turbine room. The abandoned mine reservoir can be used as the upper reservoir or the lower reservoir of the pumped storage power station, so that the reservoir does not need to be excavated again, the construction time of the dam-free pumped storage power station can be effectively shortened, and the dam-free pumped storage power station can be constructed by calculating the power evaluation value, setting the power evaluation threshold value and comparing the circuit evaluation value with the power evaluation threshold value. Therefore, daily power evaluation can be well carried out, alarm processing can be carried out when the planned generating capacity is not reached, and in the power load trough period, the water pumping amount in the trough period and the power generation plan of the next day are planned.
发明公开了一种利用废弃矿井建设无坝抽水蓄能电站的方法,具体涉及抽水蓄能电站建设领域,包括如下步骤:步骤S100,选择上库和下库,选择适宜的废弃矿井库作为抽水蓄能电站的上库或者下库;步骤S200,水轮机房的建设,将水轮机房建设在上库和下库之间,水轮机房内安装水轮机。本发明可以将废弃矿井库作为抽水蓄能电站的上库或者下库,如此不需要重新开挖水库,可以有效降低无坝抽水蓄能电站的建造时间,通过计算电力评估值,并设定电力评估阀值,将电路评估值与电力评估阀值进行比较,如此可以很好的进行每日的电力评估,在未达到计划发电量时,会进行报警处理,并且在电力负荷低谷期,规划低谷期抽水量和次日发电计划。
Method for constructing dam-free pumped storage power station by using abandoned mine
一种利用废弃矿井建设无坝抽水蓄能电站的方法
ZHU YANBIN (author) / ZENG YONGJIAN (author) / HAO YAFEI (author) / LIANG JING (author) / SUN XIAOJUAN (author)
2024-08-16
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
/
F03B
MACHINES OR ENGINES FOR LIQUIDS
,
Kraft- und Arbeitsmaschinen oder Kraftmaschinen für Flüssigkeiten
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
Pumped Storage Hydropower in Abandoned Mine Shafts: Key Concerns and Research Directions
DOAJ | 2022
|Experience in constructing The Zagorsk pumped-storage station
Springer Verlag | 1994
|Hydraulic Characteristics Analysis of Double-Bend Roadway of Abandoned Mine Pumped Storage
DOAJ | 2023
|Experience in Constructing the Zagorsk Pumped-Storage Station
British Library Online Contents | 1994
|Experience in constructing The Zagorsk pumped-storage station
Online Contents | 1994
|