Construction method for dismantling separation pile and connecting subsequent bottom plate structure
The invention provides a separation pile dismantling and subsequent bottom plate structure connecting construction method, and relates to the technical field of building construction. Comprising the following steps that separation piles are arranged in a foundation pit, the foundation pit is divided into a plurality of basements by the separation piles, and the basement on one side of the separation piles comprises an underground first-layer bottom plate; the basement on the other side of the separation pile comprises a floor slab and an underground two-layer bottom plate, and the floor slab is higher than the underground two-layer bottom plate; an outer wall is arranged between the floor slab and the bottom plate of the second underground layer and located on the side close to the separation piles; dividing the higher parts of the separation piles, cutting the higher parts of the separation piles, hoisting the higher parts and transporting the higher parts out of the foundation pit; and post-cast strips are formed at the tops of the separation piles through pouring, so that the separation piles are connected with the floor, the underground first-layer bottom plate and the outer wall through the post-cast strips correspondingly. According to the construction method, flying dust and noise generated when the separation pile is dismantled can be reduced, the broken separation pile can be effectively utilized, and the construction efficiency is improved.
本申请提供一种分隔桩拆除及后续底板结构连接施工方法,涉及建筑施工的技术领域。包括以下步骤:向基坑内设置分隔桩,所述分隔桩将基坑分隔为多个地下室,所述分隔桩一侧的地下室包括地下一层底板;所述分隔桩另一侧的地下室包括楼板和地下二层底板,所述楼板的高度高于所述地下二层底板的高度;在楼板和地下二层底板之间设置外墙,外墙位于靠近分隔桩的一侧;划分出分隔桩的高出部分,切割分隔桩的高出部分,吊装高出部分并运出基坑;在分隔桩的顶部浇筑形成后浇带,使分隔桩通过后浇带分别与楼板、地下一层底板和外墙连接。本申请能够改善在拆除分隔桩时的扬尘和噪音,以及便于破除后的分隔桩得到有效利用,提高施工效率。
Construction method for dismantling separation pile and connecting subsequent bottom plate structure
The invention provides a separation pile dismantling and subsequent bottom plate structure connecting construction method, and relates to the technical field of building construction. Comprising the following steps that separation piles are arranged in a foundation pit, the foundation pit is divided into a plurality of basements by the separation piles, and the basement on one side of the separation piles comprises an underground first-layer bottom plate; the basement on the other side of the separation pile comprises a floor slab and an underground two-layer bottom plate, and the floor slab is higher than the underground two-layer bottom plate; an outer wall is arranged between the floor slab and the bottom plate of the second underground layer and located on the side close to the separation piles; dividing the higher parts of the separation piles, cutting the higher parts of the separation piles, hoisting the higher parts and transporting the higher parts out of the foundation pit; and post-cast strips are formed at the tops of the separation piles through pouring, so that the separation piles are connected with the floor, the underground first-layer bottom plate and the outer wall through the post-cast strips correspondingly. According to the construction method, flying dust and noise generated when the separation pile is dismantled can be reduced, the broken separation pile can be effectively utilized, and the construction efficiency is improved.
本申请提供一种分隔桩拆除及后续底板结构连接施工方法,涉及建筑施工的技术领域。包括以下步骤:向基坑内设置分隔桩,所述分隔桩将基坑分隔为多个地下室,所述分隔桩一侧的地下室包括地下一层底板;所述分隔桩另一侧的地下室包括楼板和地下二层底板,所述楼板的高度高于所述地下二层底板的高度;在楼板和地下二层底板之间设置外墙,外墙位于靠近分隔桩的一侧;划分出分隔桩的高出部分,切割分隔桩的高出部分,吊装高出部分并运出基坑;在分隔桩的顶部浇筑形成后浇带,使分隔桩通过后浇带分别与楼板、地下一层底板和外墙连接。本申请能够改善在拆除分隔桩时的扬尘和噪音,以及便于破除后的分隔桩得到有效利用,提高施工效率。
Construction method for dismantling separation pile and connecting subsequent bottom plate structure
一种分隔桩拆除及后续底板结构连接施工方法
CHEN JIALIN (author) / DONG SHUCHENG (author) / WANG GUOJING (author) / WU WEICHENG (author) / ZHENG GUANYU (author) / SUN ZUGEN (author) / SHAO JUNHUA (author) / JIANG JIAWEI (author) / ZHANG XIAO (author) / LI GUANGZHENG (author)
2024-08-16
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for dismantling temporary separation pile of foundation pit
European Patent Office | 2024
|Construction method for simply dismantling beam bottom formwork of foundation connecting beam
European Patent Office | 2023
|Slope-adjustable limiting pile plate connecting device and pile plate connecting construction method
European Patent Office | 2024
|