A platform for research: civil engineering, architecture and urbanism
Integrated pump station capable of automatically removing slag
The invention provides an integrated pump station capable of automatically removing slag, and relates to the technical field of automatic cleaning of equipment. The integrated pump station capable of automatically removing the slag comprises a tank body, a water inlet is formed in the outer wall of the tank body, a pretreatment mechanism is arranged on one side of the water inlet, a supporting plate is fixedly connected to the inner wall of the tank body, an annular baffle is fixedly connected to the top of the supporting plate, a sludge discharging opening and a plurality of hole positions are formed in the top of the supporting plate, and the annular baffle is fixedly connected to the bottom of the supporting plate. The bottom of each hole site is fixedly connected with a first pipeline, the other side of each first pipeline is provided with a first sewage pump, the output end of each first sewage pump is fixedly connected with a second pipeline, and water outlets are formed among the second pipelines. By designing the cleaning mechanism, fine slag on the inner wall of the annular baffle and the top of the supporting plate can be scraped away, and the fine slag falling on the top of the supporting plate can be finally scraped into the sludge discharging opening by the scraping plate for subsequent treatment.
本发明提供一种可自动清渣的一体化泵站,涉及设备自动化清理技术领域。该可自动清渣的一体化泵站,包括罐体,所述罐体的外壁开设有进水口,所述进水口的一侧设置有预处理机构,所述罐体的内壁固定连接有支撑板,所述支撑板的顶部固定连接有环形挡板,所述支撑板的顶部分别开设有排泥口和多个孔位,多个所述孔位的底部均固定连接有第一管道,每个所述第一管道的另一侧均安装有第一排污泵,每个所述第一排污泵的输出端固定连接有第二管道,多个所述第二管道之间安装有出水口,通过设计清理机构可以将环形挡板内壁以及支撑板顶部的细渣刮除掉,掉落在支撑板顶部的细渣最终都会被刮板刮进排泥口之中,进行后续的处理。
Integrated pump station capable of automatically removing slag
The invention provides an integrated pump station capable of automatically removing slag, and relates to the technical field of automatic cleaning of equipment. The integrated pump station capable of automatically removing the slag comprises a tank body, a water inlet is formed in the outer wall of the tank body, a pretreatment mechanism is arranged on one side of the water inlet, a supporting plate is fixedly connected to the inner wall of the tank body, an annular baffle is fixedly connected to the top of the supporting plate, a sludge discharging opening and a plurality of hole positions are formed in the top of the supporting plate, and the annular baffle is fixedly connected to the bottom of the supporting plate. The bottom of each hole site is fixedly connected with a first pipeline, the other side of each first pipeline is provided with a first sewage pump, the output end of each first sewage pump is fixedly connected with a second pipeline, and water outlets are formed among the second pipelines. By designing the cleaning mechanism, fine slag on the inner wall of the annular baffle and the top of the supporting plate can be scraped away, and the fine slag falling on the top of the supporting plate can be finally scraped into the sludge discharging opening by the scraping plate for subsequent treatment.
本发明提供一种可自动清渣的一体化泵站,涉及设备自动化清理技术领域。该可自动清渣的一体化泵站,包括罐体,所述罐体的外壁开设有进水口,所述进水口的一侧设置有预处理机构,所述罐体的内壁固定连接有支撑板,所述支撑板的顶部固定连接有环形挡板,所述支撑板的顶部分别开设有排泥口和多个孔位,多个所述孔位的底部均固定连接有第一管道,每个所述第一管道的另一侧均安装有第一排污泵,每个所述第一排污泵的输出端固定连接有第二管道,多个所述第二管道之间安装有出水口,通过设计清理机构可以将环形挡板内壁以及支撑板顶部的细渣刮除掉,掉落在支撑板顶部的细渣最终都会被刮板刮进排泥口之中,进行后续的处理。
Integrated pump station capable of automatically removing slag
一种可自动清渣的一体化泵站
ZHANG SHIYOU (author) / MOU XIAOFEI (author) / ZHU PAN (author) / ZHANG WANGYU (author)
2024-08-16
Patent
Electronic Resource
Chinese
Integrated prefabricated pump station with automatic slag removing function
European Patent Office | 2015
|Ventilation type integrated pump station capable of conveniently removing precipitates
European Patent Office | 2020
|Prefabricated pump station capable of automatically separating sewage and dirt
European Patent Office | 2021
|Integrated prefabricated pump station sludge removing device
European Patent Office | 2024
|