Sunlight room for staggered floor of upper and lower stair structure and construction method thereof
The invention discloses a sunlight room for staggered floors of an up-and-down stair structure and a construction method of the sunlight room, an upper-layer structure is retracted relative to a lower-layer structure, staggered floor slabs are formed on the lower-layer structure, the sunlight room comprises a plurality of constructional columns, the constructional columns are connected to the tops of the staggered floor slabs in rows at intervals, and the constructional columns are connected with the upper-layer structure and the lower-layer structure. The multiple constructional columns abut against the inner side of a first parapet wall of the lower-layer structure and correspond to multiple structural columns of the upper-layer structure in a one-to-one mode, and a first constructional wall body is built between each constructional column and the corresponding structural column; the coping beams are connected to the first structural walls in a one-to-one correspondence mode, the first ends of the coping beams are connected with the structural columns, and the second ends of the coping beams are connected with the corresponding structural columns; the metal curtain walls are connected to the outer sides of the multiple constructional columns and the multiple coping beams, additional waterproof construction on staggered floor slabs is avoided by arranging the sunlight room, and meanwhile the use amount of the metal curtain walls is reduced.
本发明公开了一种用于上下楼结构错层的阳光房及其施工方法,上层结构相对于下层结构内收,在所述下层结构上形成有错层楼板,所述阳光房包括:多根构造柱,多根所述构造柱成排且间隔连接在所述错层楼板的顶部,多根所述构造柱贴抵至所述下层结构的第一女儿墙的内侧且与所述上层结构的多根结构柱一一对应设置,每根所述构造柱与对应所述结构柱之间均砌筑有第一构造墙体;一一对应地连接在多个所述第一构造墙体上、且第一端与所述构造柱连接,第二端与对应所述结构柱连接的多根压顶梁;金属幕墙,所述金属幕墙连接在多根所述构造柱以及多根所述压顶梁的外侧,通过设置所述阳光房避免在错层楼板进行额外防水施工,同时减少了金属幕墙的用量。
Sunlight room for staggered floor of upper and lower stair structure and construction method thereof
The invention discloses a sunlight room for staggered floors of an up-and-down stair structure and a construction method of the sunlight room, an upper-layer structure is retracted relative to a lower-layer structure, staggered floor slabs are formed on the lower-layer structure, the sunlight room comprises a plurality of constructional columns, the constructional columns are connected to the tops of the staggered floor slabs in rows at intervals, and the constructional columns are connected with the upper-layer structure and the lower-layer structure. The multiple constructional columns abut against the inner side of a first parapet wall of the lower-layer structure and correspond to multiple structural columns of the upper-layer structure in a one-to-one mode, and a first constructional wall body is built between each constructional column and the corresponding structural column; the coping beams are connected to the first structural walls in a one-to-one correspondence mode, the first ends of the coping beams are connected with the structural columns, and the second ends of the coping beams are connected with the corresponding structural columns; the metal curtain walls are connected to the outer sides of the multiple constructional columns and the multiple coping beams, additional waterproof construction on staggered floor slabs is avoided by arranging the sunlight room, and meanwhile the use amount of the metal curtain walls is reduced.
本发明公开了一种用于上下楼结构错层的阳光房及其施工方法,上层结构相对于下层结构内收,在所述下层结构上形成有错层楼板,所述阳光房包括:多根构造柱,多根所述构造柱成排且间隔连接在所述错层楼板的顶部,多根所述构造柱贴抵至所述下层结构的第一女儿墙的内侧且与所述上层结构的多根结构柱一一对应设置,每根所述构造柱与对应所述结构柱之间均砌筑有第一构造墙体;一一对应地连接在多个所述第一构造墙体上、且第一端与所述构造柱连接,第二端与对应所述结构柱连接的多根压顶梁;金属幕墙,所述金属幕墙连接在多根所述构造柱以及多根所述压顶梁的外侧,通过设置所述阳光房避免在错层楼板进行额外防水施工,同时减少了金属幕墙的用量。
Sunlight room for staggered floor of upper and lower stair structure and construction method thereof
用于上下楼结构错层的阳光房及其施工方法
LIU YINGLONG (author) / CAO CHUANWEI (author) / CHEN WENJIE (author) / ZHAI YONGJUN (author) / ZHANG YONGHUAN (author) / WANG FANGLIANG (author) / LIN WENBIAO (author) / WANG PENG (author) / DU XIULONG (author) / GAO NING (author)
2024-08-20
Patent
Electronic Resource
Chinese
CONSTRUCTION METHOD OF STAIR ROOM, AND STAIR ROOM STRUCTURE
European Patent Office | 2023
|High-altitude staggered-floor cantilever structure and construction method thereof
European Patent Office | 2022
|European Patent Office | 2023
|Construction method of movable basement or standard floor stair structure
European Patent Office | 2024
|