Outer scaffold wall connecting structure and construction method
The invention relates to the technical field of building construction, and discloses an external scaffold wall-connecting structure and a construction method, and the construction method comprises the following steps: S1, erecting an external scaffold; s2, a first formwork, a second formwork and a supporting assembly are installed; s3, a mounting hole is formed in the side, facing the outer scaffold, of the first formwork; s4, an embedded sleeve is mounted on the side, away from the outer scaffold, of the first formwork, and a connecting bolt penetrates through a mounting hole from the side, facing the outer scaffold, of the first formwork; s5, concrete is poured between the first formwork and the second formwork to form a shear wall, then the connecting bolts are dismounted, and the supporting assemblies, the first formwork and the second formwork are dismounted; and S6, the embedded sleeve and the wall connecting rod are connected through the connecting bolt, and then the wall connecting rod and the external scaffold are connected. The problem that the embedded sleeve is prone to deviation and falling off during installation can be solved, and the installation stability and construction efficiency of the embedded sleeve are improved.
本发明涉及建筑施工技术领域,公开了一种外脚手架连墙结构及施工方法,包括一下步骤:S1搭设外脚手架;S2安装第一模板、第二模板及支撑组件;S3在第一模板朝向外脚手架的一侧开设安装孔;S4在第一模板背离外脚手架的一侧安装预埋套筒,将连接螺栓从第一模板朝向外脚手架的一侧穿过安装孔;S5在第一模板及第二模板之间浇筑混凝土形成剪力墙,然后卸下连接螺栓,拆除支撑组件、第一模板及第二模板;S6通过连接螺栓连接预埋套筒及连墙杆,再连接连墙杆与外脚手架。本发明能够解决预埋套筒安装易偏位及脱落问题,以提高预埋套筒安装稳固性和施工效率。
Outer scaffold wall connecting structure and construction method
The invention relates to the technical field of building construction, and discloses an external scaffold wall-connecting structure and a construction method, and the construction method comprises the following steps: S1, erecting an external scaffold; s2, a first formwork, a second formwork and a supporting assembly are installed; s3, a mounting hole is formed in the side, facing the outer scaffold, of the first formwork; s4, an embedded sleeve is mounted on the side, away from the outer scaffold, of the first formwork, and a connecting bolt penetrates through a mounting hole from the side, facing the outer scaffold, of the first formwork; s5, concrete is poured between the first formwork and the second formwork to form a shear wall, then the connecting bolts are dismounted, and the supporting assemblies, the first formwork and the second formwork are dismounted; and S6, the embedded sleeve and the wall connecting rod are connected through the connecting bolt, and then the wall connecting rod and the external scaffold are connected. The problem that the embedded sleeve is prone to deviation and falling off during installation can be solved, and the installation stability and construction efficiency of the embedded sleeve are improved.
本发明涉及建筑施工技术领域,公开了一种外脚手架连墙结构及施工方法,包括一下步骤:S1搭设外脚手架;S2安装第一模板、第二模板及支撑组件;S3在第一模板朝向外脚手架的一侧开设安装孔;S4在第一模板背离外脚手架的一侧安装预埋套筒,将连接螺栓从第一模板朝向外脚手架的一侧穿过安装孔;S5在第一模板及第二模板之间浇筑混凝土形成剪力墙,然后卸下连接螺栓,拆除支撑组件、第一模板及第二模板;S6通过连接螺栓连接预埋套筒及连墙杆,再连接连墙杆与外脚手架。本发明能够解决预埋套筒安装易偏位及脱落问题,以提高预埋套筒安装稳固性和施工效率。
Outer scaffold wall connecting structure and construction method
外脚手架连墙结构及施工方法
LI ZHEN (author) / HUANG DIFANG (author) / LIU HAOJUN (author) / ZHONG HAIJIAN (author) / ZHONG QINGXIAN (author) / SU PEISHAN (author) / ZENG ZHAODI (author) / SU WANGJIE (author) / LIAO YUANPING (author) / WEN WEICAN (author)
2024-08-23
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Outer wall connecting structure for building construction scaffold
European Patent Office | 2021
|European Patent Office | 2022
|Building concrete outer wall scaffold connecting tube and construction method thereof
European Patent Office | 2020
|Detachable wall connecting piece for outer wall scaffold
European Patent Office | 2016
|