A platform for research: civil engineering, architecture and urbanism
The invention relates to a rapid assembly type guardrail for municipal engineering roads and a construction technology, and belongs to the technical field of guardrails. The rapid assembly type guardrail comprises a base, a supporting column is fixedly connected to the base, a supporting plate is fixedly connected to the upper end of the supporting column, a rotating rod is rotationally connected to the upper surface of the base, and the upper end of the rotating rod is rotationally connected with the supporting plate; a first connecting block is fixedly connected to the side wall of the bottom end of the rotating rod, a first cross beam is arranged at the first connecting block, a first clamping assembly used for being fixedly connected with the first cross beam in a clamped mode is arranged at the first connecting block, a second connecting block is fixedly connected to the side wall of the upper end of the rotating rod, and a second cross beam is arranged at the second connecting block. A second clamping assembly used for being clamped and fixed to the second cross beam is arranged at the second connecting block, a first fixing groove is formed in one side of the first cross beam, a second fixing groove is formed in one side of the second cross beam, and a stand column is arranged between the first cross beam and the second cross beam.
本申请涉及市政工程道路用快速拼装式护栏及施工工艺,属于护栏的技术领域,其包括底座,所述底座上固定连接有支柱,支柱的上端固定连接有支撑板,底座上表面转动连接有转杆,转杆的上端和支撑板转动连接,转杆的底端侧壁固定连接有第一连接块,第一连接块处设置有第一横梁,第一连接块处设置有用于和第一横梁卡接固定的第一卡接组件,转杆的上端侧壁固定连接有第二连接块,第二连接块处设置有第二横梁,第二连接块处设置有用于和第二横梁卡接固定的第二卡接组件,第一横梁一侧开设有第一固定槽,第二横梁一侧开设有第二固定槽,在第一横梁和第二横梁之间设置有立柱,本申请具有提高安装道路护栏工作效率的效果。
The invention relates to a rapid assembly type guardrail for municipal engineering roads and a construction technology, and belongs to the technical field of guardrails. The rapid assembly type guardrail comprises a base, a supporting column is fixedly connected to the base, a supporting plate is fixedly connected to the upper end of the supporting column, a rotating rod is rotationally connected to the upper surface of the base, and the upper end of the rotating rod is rotationally connected with the supporting plate; a first connecting block is fixedly connected to the side wall of the bottom end of the rotating rod, a first cross beam is arranged at the first connecting block, a first clamping assembly used for being fixedly connected with the first cross beam in a clamped mode is arranged at the first connecting block, a second connecting block is fixedly connected to the side wall of the upper end of the rotating rod, and a second cross beam is arranged at the second connecting block. A second clamping assembly used for being clamped and fixed to the second cross beam is arranged at the second connecting block, a first fixing groove is formed in one side of the first cross beam, a second fixing groove is formed in one side of the second cross beam, and a stand column is arranged between the first cross beam and the second cross beam.
本申请涉及市政工程道路用快速拼装式护栏及施工工艺,属于护栏的技术领域,其包括底座,所述底座上固定连接有支柱,支柱的上端固定连接有支撑板,底座上表面转动连接有转杆,转杆的上端和支撑板转动连接,转杆的底端侧壁固定连接有第一连接块,第一连接块处设置有第一横梁,第一连接块处设置有用于和第一横梁卡接固定的第一卡接组件,转杆的上端侧壁固定连接有第二连接块,第二连接块处设置有第二横梁,第二连接块处设置有用于和第二横梁卡接固定的第二卡接组件,第一横梁一侧开设有第一固定槽,第二横梁一侧开设有第二固定槽,在第一横梁和第二横梁之间设置有立柱,本申请具有提高安装道路护栏工作效率的效果。
Quick assembly type guardrail for municipal engineering road and construction process
市政工程道路用快速拼装式护栏及施工工艺
2024-08-27
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Multifunctional road guardrail for municipal construction
European Patent Office | 2020
|Isolation guardrail for municipal engineering road maintenance
European Patent Office | 2024
|