A platform for research: civil engineering, architecture and urbanism
Mounting and fixing construction method for preventing hollow floor system inner mold from floating upwards
A mounting and fixing construction method for preventing an inner mold of a hollow floor from floating is characterized by comprising the following steps that a, a first anti-floating control point is arranged in a lower area of the inner mold, and b, second anti-floating control points are arranged in a plurality of third anti-floating points (3) at rib beams. The mounting and fixing construction method for preventing the hollow floor inner mold from floating has the advantages that the first anti-floating control point, the second anti-floating control point, the first anti-floating fixing measure and the second anti-floating fixing measure are reasonably arranged, floating of the inner mold and a floor bottom mold is prevented, and construction of a cast-in-place thick hollow floor structure is safer and more reliable.
一种防止空心楼盖内模上浮的安装固定施工方法,其特征在于包括以下步骤:a、设置第一道抗浮控制点,第一道抗浮控制点设置在内模的下部区域,b、设置第二道抗浮控制点,第二道抗浮控制点设置在肋梁处的若干第三抗浮点(3)。本发明的防止空心楼盖内模上浮的安装固定施工方法具有合理布置第一道、第二道抗浮控制点,第一道、第二道抗浮固定措施,防止内模及楼板底模的上浮和使现浇厚空心楼盖结构施工更加安全可靠的优点。
Mounting and fixing construction method for preventing hollow floor system inner mold from floating upwards
A mounting and fixing construction method for preventing an inner mold of a hollow floor from floating is characterized by comprising the following steps that a, a first anti-floating control point is arranged in a lower area of the inner mold, and b, second anti-floating control points are arranged in a plurality of third anti-floating points (3) at rib beams. The mounting and fixing construction method for preventing the hollow floor inner mold from floating has the advantages that the first anti-floating control point, the second anti-floating control point, the first anti-floating fixing measure and the second anti-floating fixing measure are reasonably arranged, floating of the inner mold and a floor bottom mold is prevented, and construction of a cast-in-place thick hollow floor structure is safer and more reliable.
一种防止空心楼盖内模上浮的安装固定施工方法,其特征在于包括以下步骤:a、设置第一道抗浮控制点,第一道抗浮控制点设置在内模的下部区域,b、设置第二道抗浮控制点,第二道抗浮控制点设置在肋梁处的若干第三抗浮点(3)。本发明的防止空心楼盖内模上浮的安装固定施工方法具有合理布置第一道、第二道抗浮控制点,第一道、第二道抗浮固定措施,防止内模及楼板底模的上浮和使现浇厚空心楼盖结构施工更加安全可靠的优点。
Mounting and fixing construction method for preventing hollow floor system inner mold from floating upwards
一种防止空心楼盖内模上浮的安装固定施工方法
MA HAIXU (author) / HAN GUANGRUI (author) / DING XIANQIN (author) / LIU BAOSHUO (author) / ZHANG YU (author)
2024-08-27
Patent
Electronic Resource
Chinese
Fixing method of filling inner mold for hollow sandwich floor slab
European Patent Office | 2020
|Positioning anti-floating construction method of water stop screw for hollow floor system inner mold
European Patent Office | 2024
|Construction method for preventing underground tunnel from floating upwards
European Patent Office | 2024
|Device for preventing steel mesh plate from floating upwards for cast-in-place concrete hollow floor
European Patent Office | 2023
|Fixing device for preventing hollow membrane shell from floating and mounting method thereof
European Patent Office | 2024
|